HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 1 of 7  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  2   Thu Mar 27 09:42:04 2025 Ruijiu ChenSimulationsSimulation Results for 194Pb and 188HfSummary:

1.Simulated spectra for 194Pb and 188Hf.
 9x 
  13   Mon Mar 31 22:03:56 2025 Shahab, Yue, Carlo, Zac, EstherRunsPIDtrying to do PID with some injections:

RSAs are still on winter time. they show
  
  14   Mon Mar 31 22:13:04 2025 Shahab, Yue, Carlo, Zac, EstherRunsPID continuedcontinuing PID with better / higher resolution:

RSA01-2025.03.31.21.10.54.758.tiq_spectrum.npz
 photo_2025-03-31_22-17-30.jpg 
  107   Thu Apr 3 02:59:15 2025 JEL, ZNRunsScreenshot, beam received, baem lost, beam back againBeam is back for 10 mins-

The peaks on the analyzer appear shifted
 2025-04-03_02-58-06-109.png2025-04-03_02-57-54-019.png2025-04-03_02-57-31-430.png 
  108   Thu Apr 3 03:48:40 2025 JEL, ZNRunsScreenshots
The peaks in the analyzer are slowly shifting
back to the original position. 
 2025-04-03_03-47-28-530.png2025-04-03_03-47-11-337.png2025-04-03_03-47-42-665.png 
  112   Thu Apr 3 06:56:31 2025 JEL, ZNRunsScreenshots   2025-04-03_06-55-08-030.png2025-04-03_06-54-58-081.png2025-04-03_06-55-25-792.png 
  5   Fri Mar 28 22:20:47 2025 Sergey, ShahabGeneralPatternthe ACC pattern for both experiments.  pattern.JPG 
  22   Tue Apr 1 03:27:44 2025 MichaelGeneralLassie Monitor 2025-04-01_03-22-05-395_tcl1064.png    2025-04-01_03-22-05-395_tcl1064.png 
  25   Tue Apr 1 03:55:59 2025 MichaelGeneralLassie Monitor 2025-04-01_03-55-21-183_tcl1064.png   2025-04-01_03-55-21-183_tcl1064.png 
  26   Tue Apr 1 04:27:10 2025 MichaelGeneralLassie Monitor 2025-04-01_04-25-53-171_tcl1064.png   2025-04-01_04-25-53-171_tcl1064.png 
  27   Tue Apr 1 04:59:14 2025 MichaelGeneralLassie Monitor 2025-04-01_04-58-31-351_tcl1064.png   2025-04-01_04-58-31-351_tcl1064.png 
  28   Tue Apr 1 05:29:45 2025 MichaelGeneralLassie Monitor 2025-04-01_05-29-01-845_tcl1064.png   2025-04-01_05-29-01-845_tcl1064.png 
  29   Tue Apr 1 05:58:51 2025 MichaelGeneralLassie Monitor 2025-04-01_05-58-09-122_tcl1064.png   2025-04-01_05-58-09-122_tcl1064.png 
  30   Tue Apr 1 06:31:46 2025 MichaelGeneralLassie Monitor 2025-04-01_06-31-10-211_tcl1064.png   2025-04-01_06-31-10-211_tcl1064.png 
  31   Tue Apr 1 06:53:51 2025 Jelena B,SiddharthGeneralLassie Monitor   2025-04-01_06-49-59-989_tcl1064.png 
  32   Tue Apr 1 08:36:25 2025 Jelena B, SiddharthGeneralLassie 2025-04-01_08-37-32-155_tcl1064.png   2025-04-01_08-37-32-155_tcl1064.png 
  33   Tue Apr 1 10:03:56 2025 Jelena B, SiddharthGeneralTechnical issue with SIS18 From HKR info: there is a technical issue
with SIS18 and we will have no beam for next
25 minutes. 
 2025-04-01_10-02-16-454_tcl1064.png 
  34   Tue Apr 1 10:34:20 2025 Jelena B, SiddharthGeneralResolved issue with SIS18Beam is back with some fluctuations.
We did not have beam from 9:34 until 10:08,
around 35 minutes. 
 2025-04-01_10-33-38-948_tcl1064.png 
  35   Tue Apr 1 11:47:14 2025 Jelena B, SiddharthGeneralLassie 2025-04-01_11-46-35-517_tcl1064.png    2025-04-01_11-46-35-517_tcl1064.png 
  36   Tue Apr 1 12:58:27 2025 Jelena B, SiddharthGeneralLassie   2025-04-01_12-57-50-275_tcl1064.png 
ELOG V3.1.5-fc6679b