HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 11 of 17  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  323   Wed Apr 9 06:47:51 2025 Esther, NikosGeneralBrief beam interruptionsThere was no beam from SIS between about 06:28
and 06:39.
 2025-04-09_06-44-13-080_tcl1064.png2025-04-09_06-44-10-755_tcl1064.tdf 
  324   Wed Apr 9 09:30:14 2025 YuriGeneralSlit changingI would like to close E01 slits a bit more
and get 30 min of data with higher 
resolving power.
  
  325   Wed Apr 9 10:08:08 2025 Nikos, EstherGeneralScreenshotsLassie exports from the last morning shift
+ screenshot of Schottky TV after the last
injection from SIS
 2025-04-09_10-07-15-588_tcl1146.png2025-04-09_10-07-14-388_tcl1146.tdf2025-04-09_10-10-22-462.png 
  326   Wed Apr 9 10:24:54 2025 Yuri, Sergey, Nikos, EstherGeneralFinal InjectionThe a final injection from SIS18 stored at
10:04.
The scrapers were moved out before to get
  
  327   Wed Apr 9 11:03:48 2025 Yuri, Sergey, EstherGeneralFinal Injection> The a final injection from SIS18 stored
at 10:04.
> The scrapers were moved out before to get
  
  328   Wed Apr 9 11:09:48 2025 WolframGeneralThanks to everybody for their committment to perform this experiment     
  330   Fri Apr 11 15:49:41 2025 ShahabGeneralScreenshots of RSAsScreenshots of RSAs showing acquisition settings,
for documentation, they show the time / date
on the bottom left, in case needed for data
 11x 
  331   Fri Apr 11 15:57:37 2025 ShahabGeneralMore screenshots of RSAsmore screen shots of RSAs.  11x 
  3   Thu Mar 27 17:20:40 2025 Esther, Yue, Carlo, Zac, ShahabDetectorsSetup GenesysWe set up the Genesys. Channel map:

tr0:
 2025-03-27_17-19-33-724.png 
  46   Tue Apr 1 17:08:13 2025 JG, ID, MC, CGDetectorspleiades in positionThe pleiades detectors are now moved into
a position which does not disturb the stored
beam. 
  
  93   Wed Apr 2 20:57:34 2025 ShahabDetectors10GB cables for the DAQ rackWe have been working together with IT on the
speed of data transfer: with the new 10 GB
interface we can now transfer data from NAS
  
  114   Thu Apr 3 08:02:04 2025 Team PLEIADES (JG, ID, CJG, MC)DetectorsEntering ESR for PLEIADESWe are going to enter the ESR to check on
the PLEIADES pocket detectors and install
a nitrogen cooling.
  
  156   Fri Apr 4 16:12:14 2025 Team PLEIADESDetectorsInserting both PLEIADES detectorsWe are inserting both PLEIADES detectors step-wise,
one by one. Main beam should not be affected
too long.
  
  162   Fri Apr 4 17:13:12 2025 Team PleiadesDetectorsPLEIADES detector out17:12 We moved the PLEIADES detector out,
both are outside now (in parking position)
  
  192   Sat Apr 5 12:22:12 2025 Team PLEIADESDetectorsPLEIADES inside detector in12:23 moved PLEIADES inside detector in to
2mm.
  
  195   Sat Apr 5 14:11:49 2025 Team PLEIADESDetectorsMoving inside pocket detector14:12 We are moving the inside pocket out
for a moment, change the bias
  
  196   Sat Apr 5 14:55:21 2025 Team PLEIADESDetectorsMoving detectors in again, to 20mm14:57 We are moving the inside pocket detector
in again, this time to 20mm
  
  206   Sat Apr 5 17:26:48 2025 Team PLEIADESDetectorsOutside pocket "repair"We tried to convince the outside pocket to
move, no success. We can hear the "hissing
sound" of the pressurized air but no movement.
  
  207   Sat Apr 5 17:34:14 2025 Team PLEIADESDetectorsMoving outside detector in 17:35 Slowly moving PLEIADES outside detector
(GE01DD2AG) in for some data. Clipping ions
at -20mm. Leaving detector at -40mm for a
  
  212   Sat Apr 5 19:20:32 2025 Team PLEIADESDetectorsOutside detector moved out again19:20 The outside and inside PLEIADES detectors
are both moved back into their parking positions.
Shifts should continue monitoring the leakage
  
ELOG V3.1.5-fc6679b