ID |
Date |
Author |
Category |
Subject |
Text |
 |
323
|
Wed Apr 9 06:47:51 2025 |
Esther, Nikos | General | Brief beam interruptions | There was no beam from SIS between about 06:28
and 06:39.
|
 |
324
|
Wed Apr 9 09:30:14 2025 |
Yuri | General | Slit changing | I would like to close E01 slits a bit more
and get 30 min of data with higher
resolving power.
|
|
325
|
Wed Apr 9 10:08:08 2025 |
Nikos, Esther | General | Screenshots | Lassie exports from the last morning shift
+ screenshot of Schottky TV after the last
injection from SIS |
  |
326
|
Wed Apr 9 10:24:54 2025 |
Yuri, Sergey, Nikos, Esther | General | Final Injection | The a final injection from SIS18 stored at
10:04.
The scrapers were moved out before to get |
|
327
|
Wed Apr 9 11:03:48 2025 |
Yuri, Sergey, Esther | General | Final Injection | > The a final injection from SIS18 stored
at 10:04.
> The scrapers were moved out before to get |
|
328
|
Wed Apr 9 11:09:48 2025 |
Wolfram | General | Thanks to everybody for their committment to perform this experiment | |
|
330
|
Fri Apr 11 15:49:41 2025 |
Shahab | General | Screenshots of RSAs | Screenshots of RSAs showing acquisition settings,
for documentation, they show the time / date
on the bottom left, in case needed for data |
11x |
331
|
Fri Apr 11 15:57:37 2025 |
Shahab | General | More screenshots of RSAs | more screen shots of RSAs. |
11x |
3
|
Thu Mar 27 17:20:40 2025 |
Esther, Yue, Carlo, Zac, Shahab | Detectors | Setup Genesys | We set up the Genesys. Channel map:
tr0:
|
|
46
|
Tue Apr 1 17:08:13 2025 |
JG, ID, MC, CG | Detectors | pleiades in position | The pleiades detectors are now moved into
a position which does not disturb the stored
beam.
|
|
93
|
Wed Apr 2 20:57:34 2025 |
Shahab | Detectors | 10GB cables for the DAQ rack | We have been working together with IT on the
speed of data transfer: with the new 10 GB
interface we can now transfer data from NAS |
|
114
|
Thu Apr 3 08:02:04 2025 |
Team PLEIADES (JG, ID, CJG, MC) | Detectors | Entering ESR for PLEIADES | We are going to enter the ESR to check on
the PLEIADES pocket detectors and install
a nitrogen cooling. |
|
156
|
Fri Apr 4 16:12:14 2025 |
Team PLEIADES | Detectors | Inserting both PLEIADES detectors | We are inserting both PLEIADES detectors step-wise,
one by one. Main beam should not be affected
too long. |
|
162
|
Fri Apr 4 17:13:12 2025 |
Team Pleiades | Detectors | PLEIADES detector out | 17:12 We moved the PLEIADES detector out,
both are outside now (in parking position) |
|
192
|
Sat Apr 5 12:22:12 2025 |
Team PLEIADES | Detectors | PLEIADES inside detector in | 12:23 moved PLEIADES inside detector in to
2mm. |
|
195
|
Sat Apr 5 14:11:49 2025 |
Team PLEIADES | Detectors | Moving inside pocket detector | 14:12 We are moving the inside pocket out
for a moment, change the bias |
|
196
|
Sat Apr 5 14:55:21 2025 |
Team PLEIADES | Detectors | Moving detectors in again, to 20mm | 14:57 We are moving the inside pocket detector
in again, this time to 20mm |
|
206
|
Sat Apr 5 17:26:48 2025 |
Team PLEIADES | Detectors | Outside pocket "repair" | We tried to convince the outside pocket to
move, no success. We can hear the "hissing
sound" of the pressurized air but no movement. |
|
207
|
Sat Apr 5 17:34:14 2025 |
Team PLEIADES | Detectors | Moving outside detector in | 17:35 Slowly moving PLEIADES outside detector
(GE01DD2AG) in for some data. Clipping ions
at -20mm. Leaving detector at -40mm for a |
|
212
|
Sat Apr 5 19:20:32 2025 |
Team PLEIADES | Detectors | Outside detector moved out again | 19:20 The outside and inside PLEIADES detectors
are both moved back into their parking positions.
Shifts should continue monitoring the leakage |
|