HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 14 of 17  Not logged in ELOG logo
ID Date Authordown Category Subject
  89   Wed Apr 2 18:22:30 2025 IDGeneralSpill cycle distribution
The spill cycle distributions is absolutely nuts since beginning of the shift. On the positive side: we got a lot of spills since FRS did not take many, so I think we got more than our parasitic 1:10 share...
  90   Wed Apr 2 18:31:52 2025 IDGeneralFYI for morning shifts Thu
The PLEIADES team (pocket detectors) has discussed with Wolfram to get access to the ESR tomorrow (Thu) morning ~8:00 to check their detectors and install a dry N2 flow connection. This might take about 1h. Iris (or Jan) will call the HKR to get the RP shift for the transport of the N2 bottle into the ESR. Morning shift will be informed accordingly when we are onsite, just keep running (keep running...keep running...keep running) until we get access.
  115   Thu Apr 3 09:34:42 2025 IDGeneralFinished in the ESR as of 9:05
We had stopped the RSAs at 8:00 (call for restart)
Time stamp computer stopped and started at 9:35
  169   Fri Apr 4 20:48:25 2025 IDGeneralPocket moved
20:48: Inside pocket moved to 60mm and back to the outside position.
  217   Sat Apr 5 23:31:54 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-05_23-28-53-195.png
2025-04-05_23-28-53-195.png
Attachment 2: 2025-04-05_23-29-28-092.png
2025-04-05_23-29-28-092.png
Attachment 3: 2025-04-05_23-29-47-357.png
2025-04-05_23-29-47-357.png
Attachment 4: 2025-04-05_23-29-58-059.png
2025-04-05_23-29-58-059.png
  218   Sun Apr 6 00:34:17 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-06_00-32-31-774.png
2025-04-06_00-32-31-774.png
Attachment 2: 2025-04-06_00-32-52-372.png
2025-04-06_00-32-52-372.png
Attachment 3: 2025-04-06_00-33-12-786.png
2025-04-06_00-33-12-786.png
Attachment 4: 2025-04-06_00-33-23-240.png
2025-04-06_00-33-23-240.png
  219   Sun Apr 6 01:34:53 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-06_01-32-30-778.png
2025-04-06_01-32-30-778.png
Attachment 2: 2025-04-06_01-32-56-333.png
2025-04-06_01-32-56-333.png
Attachment 3: 2025-04-06_01-33-15-859.png
2025-04-06_01-33-15-859.png
Attachment 4: 2025-04-06_01-33-24-377.png
2025-04-06_01-33-24-377.png
  220   Sun Apr 6 02:33:53 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-06_02-31-58-295.png
2025-04-06_02-31-58-295.png
Attachment 2: 2025-04-06_02-32-16-577.png
2025-04-06_02-32-16-577.png
Attachment 3: 2025-04-06_02-32-33-451.png
2025-04-06_02-32-33-451.png
Attachment 4: 2025-04-06_02-32-43-871.png
2025-04-06_02-32-43-871.png
  223   Sun Apr 6 04:30:13 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-06_04-28-35-019.png
2025-04-06_04-28-35-019.png
Attachment 2: 2025-04-06_04-28-53-232.png
2025-04-06_04-28-53-232.png
Attachment 3: 2025-04-06_04-29-17-532.png
2025-04-06_04-29-17-532.png
Attachment 4: 2025-04-06_04-29-35-314.png
2025-04-06_04-29-35-314.png
  224   Sun Apr 6 05:34:29 2025 Hongfu Li, Xing XuGeneralLassie screen shot
Attachment 1: 2025-04-06_05-32-36-496.png
2025-04-06_05-32-36-496.png
Attachment 2: 2025-04-06_05-32-55-394.png
2025-04-06_05-32-55-394.png
Attachment 3: 2025-04-06_05-33-16-769.png
2025-04-06_05-33-16-769.png
Attachment 4: 2025-04-06_05-33-24-921.png
2025-04-06_05-33-24-921.png
  221   Sun Apr 6 02:58:43 2025 Hongfu Li, XIng XuGeneralSIS no beam for a moment and beam back soon after call main control room
  222   Sun Apr 6 03:31:05 2025 Hongfu Li, XIng XuGeneralLassie screen shot
Attachment 1: 2025-04-06_03-28-52-981.png
2025-04-06_03-28-52-981.png
Attachment 2: 2025-04-06_03-29-11-923.png
2025-04-06_03-29-11-923.png
Attachment 3: 2025-04-06_03-29-37-324.png
2025-04-06_03-29-37-324.png
Attachment 4: 2025-04-06_03-29-46-959.png
2025-04-06_03-29-46-959.png
  225   Sun Apr 6 06:27:50 2025 Hongfu Li, XIng XuGeneralLassie screen shot
Attachment 1: 2025-04-06_06-25-52-591.png
2025-04-06_06-25-52-591.png
Attachment 2: 2025-04-06_06-26-10-173.png
2025-04-06_06-26-10-173.png
Attachment 3: 2025-04-06_06-26-26-183.png
2025-04-06_06-26-26-183.png
Attachment 4: 2025-04-06_06-26-34-814.png
2025-04-06_06-26-34-814.png
  226   Sun Apr 6 06:51:08 2025 Hongfu LI, Xing Xu, Gregor KosirGenerallassie screen shot
Attachment 1: 2025-04-06_06-49-37-366.png
2025-04-06_06-49-37-366.png
Attachment 2: 2025-04-06_06-49-25-693.png
2025-04-06_06-49-25-693.png
Attachment 3: 2025-04-06_06-48-51-824.png
2025-04-06_06-48-51-824.png
Attachment 4: 2025-04-06_06-48-27-345.png
2025-04-06_06-48-27-345.png
  182   Sat Apr 5 08:01:14 2025 Hannes, CaglaGeneralLassie screenshot and drop in particles
After a ~ two minute outage of the "ESR via TE (FAST)" beam at 07:48 the particles dropped by half. See screenshot 2025-04-05_08-01-34-267.png
Attachment 1: 2025-04-05_08-01-53-197.png
2025-04-05_08-01-53-197.png
Attachment 2: 2025-04-05_08-01-34-267.png
2025-04-05_08-01-34-267.png
Attachment 3: 2025-04-05_08-02-22-703.png
2025-04-05_08-02-22-703.png
Attachment 4: 2025-04-05_08-02-15-951.png
2025-04-05_08-02-15-951.png
  183   Sat Apr 5 08:15:09 2025 Hannes, CaglaGeneralParticles are back to previous intensity
Attachment 1: 2025-04-05_08-15-54-989.png
2025-04-05_08-15-54-989.png
Attachment 2: 2025-04-05_08-15-29-803.png
2025-04-05_08-15-29-803.png
  184   Sat Apr 5 09:03:36 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_09-03-16-304.png
2025-04-05_09-03-16-304.png
Attachment 2: 2025-04-05_09-02-59-556.png
2025-04-05_09-02-59-556.png
Attachment 3: 2025-04-05_09-04-37-020.png
2025-04-05_09-04-37-020.png
Attachment 4: 2025-04-05_09-04-30-351.png
2025-04-05_09-04-30-351.png
  186   Sat Apr 5 10:16:11 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_10-15-58-440.png
2025-04-05_10-15-58-440.png
Attachment 2: 2025-04-05_10-15-38-606.png
2025-04-05_10-15-38-606.png
Attachment 3: 2025-04-05_10-17-11-450.png
2025-04-05_10-17-11-450.png
Attachment 4: 2025-04-05_10-17-05-194.png
2025-04-05_10-17-05-194.png
  187   Sat Apr 5 10:51:00 2025 Hannes, CaglaGeneralBeam gone
Beam is gone since 10:45.
According to the main control room there is a problem in SIS18. They are looking into the problem.
  188   Sat Apr 5 11:00:57 2025 Hannes, CaglaGeneralLassie screenshots
Attachment 1: 2025-04-05_11-01-12-579.png
2025-04-05_11-01-12-579.png
Attachment 2: 2025-04-05_11-00-55-466.png
2025-04-05_11-00-55-466.png
Attachment 3: 2025-04-05_11-02-03-332.png
2025-04-05_11-02-03-332.png
Attachment 4: 2025-04-05_11-01-56-473.png
2025-04-05_11-01-56-473.png
ELOG V3.1.5-fc6679b