ID |
Date |
Author |
Category |
Subject |
124
|
Thu Apr 3 15:57:16 2025 |
Shahab, Yue, Zac, Esther | DAQ | Data acquisitions running |
All data acquisitions (both RSAs and NTCAP) are now running. |
205
|
Sat Apr 5 17:01:30 2025 |
Ragan, Dima, Zac, Shahab | DAQ | DAQs stopped |
NTCAP and analysers are stopped at 17:00.Iris goes inside to move the detectors |
12
|
Mon Mar 31 20:53:02 2025 |
Shahab, Carlo, Zac, Esther, Michael | DAQ | DAQ start |
20:28 started NTCAP
started queqiao file transfer for RSAs only
started analyzer looper for RSAs
|
305
|
Tue Apr 8 09:28:49 2025 |
Team PLEIADES | General | Controlled access to ESR to connect cables for DAQ |
We will need to enter the ESR to connect the cables again for our DAQ and then drive in the outside detector for 20min to get some data.
9:35 entered
9:41 exit
9:44 ESR available again |
199
|
Sat Apr 5 15:20:19 2025 |
Yuri | General | Change to 188Hf |
Before changing we check how much we cut with the ESR scrapers
two lines
208Pb80+ with slits intensity 15 arb u
204Hg78+ ... 0.055
Now, slits fully open
208Pb80+ with slits intensity 127 arb u
204Hg78+ ... 0.25
Increase compared to 188Hf measurement:
208Pb80+ increase of factor 8.5
204Hg78+ increase of factor 14 |
50
|
Tue Apr 1 20:37:04 2025 |
Jeroen | DAQ | Change of settings for shorter acq. window |
Acquisition stopped at 20:36.
First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq
Last file from this setting: RSA01-2025.04.01.20.36.54.257.tiq
acq. length changed to 500 ms
acq bw changed to 50 MHz
==> 12 MSamples
Trigger window condition set to 50%.
First file from this setting: RSA01-2025.04.01.20.45.40.053.tiq
Analysis setting the the frame length 2^16 and frame number = 190. |
51
|
Tue Apr 1 21:05:20 2025 |
Jeroen, Zac, Esther, Shahab, Wolfram | DAQ | Change of settings for shorter acq. window |
> Acquisition stopped at 20:36.
>
> First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq
>
> Last file from this setting: RSA01-2025.04.01.20.36.54.257.tiq
>
> acq. length changed to 500 ms
>
> acq bw changed to 50 MHz
>
> ==> 12 MSamples
>
> Trigger window condition set to 50%.
>
> First file from this setting: RSA01-2025.04.01.20.45.40.053.tiq
>
> Analysis setting the the frame length 2^16 and frame number = 190.
Last file from previous setting: RSA01-2025.04.01.21.06.30.580.tiq
Changed the RSA01,02 to 50 MSamples/s (20nsec/sample) for 500.00 ms acq. length, 25 MHz acq. BW, 33% trigger position.
First good file from this time: 21:37 04.01.2025 -- RSA01-2025.04.01.21.37.13.721.tiq |
57
|
Tue Apr 1 23:56:18 2025 |
Shahab, Carlo, Zac, Yue, Michael | DAQ | Change of RSA01 settings for new harmonic=212. |
23:55 stop the RSAs.
410:
last file from previous setting (harmonic=211): 2025.04.01.23.55.21.712.
new plunger position for 410 cavity: 33.5 inside and outside.
new center frequency: 410535000 Hz.
245:
harmonic didn't change, still 126.
adjusted center frequency to 243997000 Hz.
00:31 restart the RSAs.
new files from: 2025.04.02.00.31.11.796. |
323
|
Wed Apr 9 06:47:51 2025 |
Esther, Nikos | General | Brief beam interruptions |
There was no beam from SIS between about 06:28 and 06:39.
Again from 07:02 to 07:11.
And again from 07:49 to 07:55. |
267
|
Mon Apr 7 10:49:04 2025 |
Jelena, Guy | General | Beam stops for tuning |
We stop taking beam at 10:47 for tuning a new setting.
Team PLEIADES is wanting to get access for 10 mins to install a remote oscilloscope, so entry to the ESR has been requested. |
317
|
Tue Apr 8 14:16:16 2025 |
Michael, Cagla | General | Beam stopped for Accelerator Tour etc. |
The beam was stopped for the evaluation accelerator tour. RSAs and NTCAP stopped now. |
240
|
Sun Apr 6 18:36:56 2025 |
Shahab, Moriguchi, Taka | Accelerator | Beam stopped |
Beam stopped due to device trouble. |
243
|
Sun Apr 6 19:23:09 2025 |
Shahab, Moriguchi, Taka | Accelerator | Beam sharing |
Beam sharing with FRS is now 1 to 1. |
245
|
Sun Apr 6 20:13:03 2025 |
Taka, Moriguchi | Accelerator | Beam sharing |
Now we have every injection. |
248
|
Sun Apr 6 21:29:37 2025 |
Taka, Moriguchi | Accelerator | Beam sharing |
again, ESR : FRS = 1 : 1 |
64
|
Wed Apr 2 05:48:31 2025 |
Chris, Carlo, Zac | General | Beam returned |
Beam was returned to the ESR at 05:11.
HKR said there had been some problem with one of the dipoles and in order to restore it a power supply had to be reset, which took some time.
05:41 data are back in the RSAs. Files that contain data from:
RSA01-2025.04.02.05.41.14.938.tiq_spectrogram.npz
to:
RSA01-2025.04.02.06.24.01.530.tiq_spectrogram.npz
06:24 data not visible again, only noise.
06:43 data are ack in the RSAs. Files that contain data from:
RSA01-2025.04.02.06.43.43.580.tiq_spectrogram.npz |
111
|
Thu Apr 3 06:33:08 2025 |
Zac, Johan | General | Beam lost at 06:27, returned at 06:34 |
Spike in beam intensity at 06:27 (5x usual intensity) and then beam is lost. HKR says it's a problem with the magnet's power supply. Once the beam returned, the peaks are shifted to the left but are slowly shifting back into position. |
109
|
Thu Apr 3 05:11:37 2025 |
Zac, Johan | General | Beam lost at 05:07, returned at 05:14 |
|
100
|
Thu Apr 3 00:49:00 2025 |
Zac, Johan | General | Beam lost at 00:46 |
|
60
|
Wed Apr 2 01:46:52 2025 |
Chris, Carlo, Zac | General | Beam loss |
HKR just called to say a power supply to the SIS18 extraction kicker has failed.
The service person has been called and is expected to take ~1h to arrive and approx. ~2h to carry out the repair. |