HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 17 of 17  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Apr 4 23:33:51 2025, Ruijiu Chen, Analysis, Analysis during April 4th 16:00-22:00 photo_2025-04-04_23-34-49.jpgphoto_2025-04-04_23-35-29.jpgphoto_2025-04-04_23-35-52.jpgphoto_2025-04-04_23-36-12.jpgsummed_spectrum_total_April04_1600_2200.npz
Until now, there is no 184Hf72+ and 186Hf72+ ions. 
Entry  Sun Apr 6 22:53:53 2025, Michael, Analysis, Added shift tracking and power threshold to Shahab's npz_addup.py 
I added automatic shift tracking and a check for a minimum wanted power in that bin to Shahab's npz_addup.py script.
It looks for the highest bin in the projected spectrum (so after time-cut) and tracks it position. Careful, it uses the position in the very first FILE as reference. So, the ordering in the given file list affects this.

Here's Shahab's log entry about the initial script:
https://elog.gsi.de/esr/E0203_E0018/137

Created pull request in Shahabs repo:
https://github.com/xaratustrah/e0018_e0203_scripts/pull/1

Before that is accepted, find the script here:
https://github.com/mijja-koeln/e0018_e0203_scripts/blob/main/npz_addup.py


New command line options are:
  -h, --help            show this help message and exit
  -t TIME_CUT, --time-cut TIME_CUT
                        Start time as a float (optional)
  -s, --shift-track     Enable shift tracking based on strongest peak in spectrum (optional)
  -l PWR_LIMIT, --pwr-limit PWR_LIMIT
                        Set minimum power required to process file (optional)
  -v, --verbose         Print additional information (optional)


"-s" enables shift tracking and correction.

"-l" enables power limit / threshold. Only files with at least this power in the highest bin are used for summation.

"-v" prints infos abuot the tracking in each file. Optional, if you want to see how good it works.

The --time-cut option is applied in all scenarios, i.e. also before projection used for tracking.

Have fun!
Entry  Sun Apr 6 17:29:04 2025, Ruijiu Chen, Analysis, 188Hf72+ spectrum and single ion line from NTCAP data photo_2025-04-06_17-30-36.jpgphoto_2025-04-06_17-30-59.jpgphoto_2025-04-06_17-32-55.jpgphoto_2025-04-06_17-33-27.jpg
This shows the spectrum of 188Hf72+ during "April06_01:00_02:00". Until April 6 2:00, the Bp = 7.918262 Tm has not been changed. 
The ntcap spectrum is from:
/data.local/G22-00018_00203/results/ntcap/iq/IQ_2025-04-05_17-43-49/0000756.iq.tdms.root


analysis settings:

2^18 samples per frame + average over 32 frame.
26.21 ms per frame
838.86 ms for 32 averaged frames
Entry  Sat Apr 5 16:48:26 2025, Ragan, Wolfram, Sergey, Zsolt, Yuri, Rui-Jiu, General, 188Hf72+ 
Now ESR is set to the 188Hf72+ setting.
Entry  Thu Apr 3 13:36:17 2025, Ruijiu,Yuri, Wolfram,Zsolt, Analysis, 188Hf identification Screenshot_2025-04-03_15-19-47.pngScreenshot_2025-04-03_15-21-53_1.pngScreenshot_2025-04-03_15-23-37.pngsimulation_result.outScreenshot_2025-04-03_15-41-11.png
 
Entry  Sat Apr 5 16:54:58 2025, Zsolt, General, 188Hf +72 setting back 
The 188Hf72+ setting measurement starts now. Exactly the same setting like two days ago.
Entry  Fri Apr 4 16:01:09 2025, ID, MC, Kanika, General, 186Hf running now + Lassie screenshots 2025-04-04_16-03-30-165.png2025-04-04_16-03-16-249.png2025-04-04_16-02-19-195.png
Tuning is finished, 186Hf is running. Sharp peaks now.
Entry  Fri Apr 4 17:59:33 2025, Zac , Sid, DAQ, 17:58 
DAQ stopped with last file in RSA1-2025.04.04.17.58.49.340.tiq

Now the plan is to change one of the analyzers to narrow band recording for longer from the 245 Schotkky. 
Entry  Wed Apr 2 20:57:34 2025, Shahab, Detectors, 10GB cables for the DAQ rack 
We have been working together with IT on the speed of data transfer: with the new 10 GB interface we can now transfer data from NAS to Lustre with 400MB/s. From NAS to GPU Computer up to 700MB/s. All cables around the rack are now 10GB capable.
Entry  Fri Apr 4 11:44:31 2025, Ragan, Wolfram, Sergey, Zsolt, Magda, General, ESR setting change from 188Hf72+ to 186Hf72+  
ESR setting is changed from 188Hf72+ to 186Hf72+. SIS-18 beam energy for 
this fragment is 510 MeV/u.Brho = 7.86166 Tm.
ELOG V3.1.5-fc6679b