HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 2 of 9  Not logged in ELOG logo
ID Datedown Author Category Subject
  141   Fri Apr 4 04:45:39 2025 zhang, zhouGeneralscreenshot
Attachment 1: 2025-04-04_04-42-23-350.png
2025-04-04_04-42-23-350.png
Attachment 2: 2025-04-04_04-42-41-320.png
2025-04-04_04-42-41-320.png
Attachment 3: 2025-04-04_04-44-00-048.png
2025-04-04_04-44-00-048.png
Attachment 4: 2025-04-04_04-44-11-126.png
2025-04-04_04-44-11-126.png
Attachment 5: 2025-04-04_04-44-51-584_tcl1064.tdf
  140   Fri Apr 4 03:44:59 2025 zhang, zhouGeneralscreenshot
Attachment 1: 2025-04-04_03-45-45-686.png
2025-04-04_03-45-45-686.png
Attachment 2: 2025-04-04_03-48-17-745.png
2025-04-04_03-48-17-745.png
Attachment 3: 2025-04-04_03-48-53-116.png
2025-04-04_03-48-53-116.png
Attachment 4: 2025-04-04_03-48-59-918.png
2025-04-04_03-48-59-918.png
Attachment 5: 2025-04-04_03-49-38-829_tcl1064.tdf
  139   Fri Apr 4 02:51:30 2025 zhang, zhouGeneralscreenshot
Attachment 1: 2025-04-04_02-45-05-549.png
2025-04-04_02-45-05-549.png
Attachment 2: 2025-04-04_02-47-06-712.png
2025-04-04_02-47-06-712.png
Attachment 3: 2025-04-04_02-48-10-010.png
2025-04-04_02-48-10-010.png
Attachment 4: 2025-04-04_02-50-11-698_tcl1064.tdf
Attachment 5: 2025-04-04_02-49-35-085.png
2025-04-04_02-49-35-085.png
  138   Fri Apr 4 01:41:48 2025 Zhang, ZhouGeneralScreenshots
Attachment 1: 2025-04-04_01-40-34-575.png
2025-04-04_01-40-34-575.png
Attachment 2: 2025-04-04_01-40-42-763.png
2025-04-04_01-40-42-763.png
Attachment 3: 2025-04-04_01-40-16-954.png
2025-04-04_01-40-16-954.png
Attachment 4: 2025-04-04_01-40-23-181.png
2025-04-04_01-40-23-181.png
Attachment 5: 2025-04-04_01-41-03-078_tcl1064.tdf
  137   Fri Apr 4 01:12:03 2025 ShahabAnalysisNPZ add up script
Since there are many NPZ summer scripts around, I thought I would also share mine. This one takes advantage of the power of filelists and has a progress bar. Creating file lists gives you more control over the range of analyzed data, for example, the command:

find /data.local/G22-00018_00203/results/analyzers/RSA02 -name "RSA02-2025.04.04.01.??.??.???.tiq_spectrogram.npz" > filelist.txt

makes a file list of everything file that was produced during the second hour of the morning of the April 4th. You can fine tune the wildcards according to the time range you are interested in.


then just call the script by:

python npz_addup.py filelist.txt

you can also provide time cuts, like this:

python npz_addup.py --time-cut 0.14 filelist.txt

which will cut away first 0.14 seconds of the spectrogram. Without time cuts, it will do over the whole range.


It creates 4 type of files:

summed_spectrum.npz --> for use with RionID for PID
summed_spectrogram.npz --> for general use / analysis
summed_spectrum.png --> for general view
summed_spectrogram.png --> for detailed view

if time-cut is provided, the filenames will have a "_time_cut" suffix at the end.


Here is the link to the script:

https://github.com/xaratustrah/e0018_e0203_scripts/blob/main/npz_addup.py

examples are in attachment:
Attachment 1: summed_spectrogram_time_cut.png
summed_spectrogram_time_cut.png
Attachment 2: summed_spectrogram.png
summed_spectrogram.png
  136   Fri Apr 4 00:46:18 2025 Zhang, ZhouGeneralScreenshots
Attachment 1: 2025-04-04_00-45-20-623.png
2025-04-04_00-45-20-623.png
Attachment 2: 2025-04-04_00-45-26-530.png
2025-04-04_00-45-26-530.png
Attachment 3: 2025-04-04_00-45-41-060.png
2025-04-04_00-45-41-060.png
Attachment 4: 2025-04-04_00-45-45-303.png
2025-04-04_00-45-45-303.png
Attachment 5: 2025-04-04_00-46-39-027_tcl1064.tdf
  135   Thu Apr 3 23:42:05 2025 Zhang, ZhouGeneralScreenshots
Attachment 1: 2025-04-03_23-38-53-553.png
2025-04-03_23-38-53-553.png
Attachment 2: 2025-04-03_23-39-23-636.png
2025-04-03_23-39-23-636.png
Attachment 3: 2025-04-03_23-39-40-886.png
2025-04-03_23-39-40-886.png
Attachment 4: 2025-04-03_23-39-47-569.png
2025-04-03_23-39-47-569.png
Attachment 5: 2025-04-03_23-43-29-862_tcl1064.tdf
  134   Thu Apr 3 23:23:20 2025 Zhang Min, Zhou XuAcceleratorBeam injection change
The SIS operator says that FRS doesn't need beam now, ESR will receive the full SIS beam extraction every 3 secs overnight. All the secondary beams are injected into ESR from now on.
Attachment 1: 2025-04-03_23-21-03-095.png
2025-04-03_23-21-03-095.png
  133   Thu Apr 3 22:25:49 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_22-26-13-116.png
2025-04-03_22-26-13-116.png
Attachment 2: 2025-04-03_22-26-24-105.png
2025-04-03_22-26-24-105.png
Attachment 3: 2025-04-03_22-27-26-640.png
2025-04-03_22-27-26-640.png
Attachment 4: 2025-04-03_22-27-34-598.png
2025-04-03_22-27-34-598.png
Attachment 5: 2025-04-03_22-28-26-878_tcl1064.tdf
  132   Thu Apr 3 21:25:40 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_21-23-03-733.png
2025-04-03_21-23-03-733.png
Attachment 2: 2025-04-03_21-23-31-673.png
2025-04-03_21-23-31-673.png
Attachment 3: 2025-04-03_21-24-01-343_tcl1064.tdf
Attachment 4: 2025-04-03_21-24-35-264.png
2025-04-03_21-24-35-264.png
Attachment 5: 2025-04-03_21-24-42-340.png
2025-04-03_21-24-42-340.png
  131   Thu Apr 3 20:01:58 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_20-00-57-730.png
2025-04-03_20-00-57-730.png
Attachment 2: 2025-04-03_20-02-19-209.png
2025-04-03_20-02-19-209.png
Attachment 3: 2025-04-03_20-02-55-335.png
2025-04-03_20-02-55-335.png
Attachment 4: 2025-04-03_20-03-03-078.png
2025-04-03_20-03-03-078.png
Attachment 5: 2025-04-03_20-31-02-325_tcl1064.tdf
  130   Thu Apr 3 18:53:02 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_18-53-33-868.png
2025-04-03_18-53-33-868.png
Attachment 2: 2025-04-03_18-54-24-462.png
2025-04-03_18-54-24-462.png
Attachment 3: 2025-04-03_18-55-11-137.png
2025-04-03_18-55-11-137.png
Attachment 4: 2025-04-03_18-55-22-991.png
2025-04-03_18-55-22-991.png
  129   Thu Apr 3 18:01:49 2025 Ruijiu, CarloAnalysisIdentification of 188Hf
Attachment 1: Screenshot_2025-04-03_18-02-52_1.png
Screenshot_2025-04-03_18-02-52_1.png
Attachment 2: sum_1556-1627_spectrum.npz
Attachment 3: Screenshot_2025-04-03_18-04-19.png
Screenshot_2025-04-03_18-04-19.png
  128   Thu Apr 3 17:49:57 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_17-49-01-753.png
2025-04-03_17-49-01-753.png
Attachment 2: 2025-04-03_17-50-33-265.png
2025-04-03_17-50-33-265.png
Attachment 3: 2025-04-03_17-51-26-693.png
2025-04-03_17-51-26-693.png
Attachment 4: 2025-04-03_17-52-07-151.png
2025-04-03_17-52-07-151.png
  127   Thu Apr 3 17:38:47 2025 Shahab, Zac, Carlo, Esther and many moreDAQRSAs run again!
first file name RSA01....17.38 onwards.
Attachment 1: IMG_4972.JPG
IMG_4972.JPG
Attachment 2: IMG_4973.JPG
IMG_4973.JPG
  126   Thu Apr 3 17:01:07 2025 CJ Griffin, M Cockshutt, G LeckenbyGeneralMoving PLEIADES detectors in
The inner PLEIADES is moved into position close to the beam.
Device control for the outside pocket is not currently working so that pocket remains in its outward position.

NTCAP/Schottky data acquisition stopped during pocket position tests.

Inner detector (x86l-124 BGO)
Device: GE01DD2IG
Position: +20 mm
Scraping beam: not possible

Outer detector (x86l-131 GAGG)
Device: GE01DD2AG
Position: -127 mm
Scraping beam: 
  125   Thu Apr 3 16:44:18 2025 Usama, KathrinGeneralScreenshots
Attachment 1: 2025-04-03_16-44-51-040.png
2025-04-03_16-44-51-040.png
Attachment 2: 2025-04-03_16-45-58-954.png
2025-04-03_16-45-58-954.png
Attachment 3: 2025-04-03_16-46-46-981.png
2025-04-03_16-46-46-981.png
Attachment 4: 2025-04-03_16-48-47-815.png
2025-04-03_16-48-47-815.png
  124   Thu Apr 3 15:57:16 2025 Shahab, Yue, Zac, EstherDAQData acquisitions running
All data acquisitions (both RSAs and NTCAP) are now running.
  123   Thu Apr 3 15:55:04 2025 Shahab, Yue, EstherCalibrationSchottky settings
Settings similar to the 2-photon experiment.

Central frequency: 411.742243 MHz (based on Ruijius identification for 188Hf72+)
  122   Thu Apr 3 15:21:42 2025 CJGGeneralPLEIADES shift instructions
PLEIADES shift instructions available at:
https://docs.google.com/document/d/19b4wyugC3OpVAjwt1ONM9u8EYdMJsBpL7GVNzoziv0M/edit?usp=sharing

Leakage current tracking:
https://docs.google.com/spreadsheets/d/1Gt1tFHwn4XFrJ5_-nQvTi635UD0aHgN6gCdXDTHQdkI/edit?gid=299353113#gid=299353113

Leakage currents should be documented every ~1-2 hours while the detectors are biased.
ELOG V3.1.5-fc6679b