HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 3 of 17  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Apr 2 18:15:06 2025, ID, HA, MW, General, Lassie screenshots 2025-04-02_18-14-21-624.png
 
Entry  Wed Apr 2 18:22:30 2025, ID, General, Spill cycle distribution 
The spill cycle distributions is absolutely nuts since beginning of the shift. On the positive side: we got a lot of spills since FRS did not take many, so I think we got more than our parasitic 1:10 share...
Entry  Wed Apr 2 18:31:52 2025, ID, General, FYI for morning shifts Thu 
The PLEIADES team (pocket detectors) has discussed with Wolfram to get access to the ESR tomorrow (Thu) morning ~8:00 to check their detectors and install a dry N2 flow connection. This might take about 1h. Iris (or Jan) will call the HKR to get the RP shift for the transport of the N2 bottle into the ESR. Morning shift will be informed accordingly when we are onsite, just keep running (keep running...keep running...keep running) until we get access.
Entry  Wed Apr 2 19:13:50 2025, ID, HA, General, Lassie screenshots and Schottky screenshot 2025-04-02_19-10-29-388_tcl1064.png2025-04-02_19-14-53-428_tcl1146.png2025-04-02_19-19-23-765.png
Looks a bit more regular now (FRS people having dinner???)
Entry  Wed Apr 2 20:15:29 2025, ID, HA, General, Lassie screenshots + Schottky TV 2025-04-02_20-15-48-827_tcl1064.png2025-04-02_20-17-14-017.png2025-04-02_20-18-29-150.png
Screeeeeeeenshooooots!
Entry  Wed Apr 2 21:22:41 2025, ID, HA, General, Lassie Come-Home Screenshots (wuff!) 2025-04-02_21-25-00-716.png2025-04-02_21-25-42-535.png2025-04-02_21-26-12-022.png
(Who let the dog out?)
Sharing with FRS 6:1 since a while now.
Entry  Wed Apr 2 22:47:25 2025, ID, HA (Radio Shahab as background), General, Lassie and Schottky TV screentshots 2025-04-02_22-44-18-420.png2025-04-02_22-45-12-849.png2025-04-02_22-55-14-900.png
We managed to take some screenshots while Shahab harrassed us with AI-created "RammstAIn" music... happy to end my shift now!
Entry  Wed Apr 2 23:40:23 2025, JEL, ZN, General, Screenshots taken just as beam came back 2025-04-02_23-39-29-655.png2025-04-02_23-37-10-651.png2025-04-02_23-36-58-664.png
We are seeing spills being received but no peaks are seen in the analyzers. 

We are seeing several intermittent losses of beam. Awaiting action to see if it stabilizes.


23.51 Beam is back and we see the nice spectrum in the analyzer.
Entry  Thu Apr 3 00:49:00 2025, Zac, Johan, General, Beam lost at 00:46 
 
Entry  Thu Apr 3 01:14:16 2025, Zac, Johan, General, Beam is back at 01:12 
 
Entry  Thu Apr 3 01:19:44 2025, Zac, Johan, General, Beam fluctuations 
Beam gone again between 01:14 and 01:18, then again at 01:19. HKR says there are problems with the source.
Entry  Thu Apr 3 01:29:49 2025, Zac, Johan, General, Beam is back at 01:27 
 
Entry  Thu Apr 3 01:56:57 2025, Zac, Johan, General, Problems with one of the quadrupoles 
Since around 01:45 we get spills but see nothing on analysers. HKR says there is a problem with one of the quadrupoles; they are working on it.
Entry  Thu Apr 3 02:01:29 2025, Zac, Johan, General, Quadrupole issues 
HKR has called someone to fix the quadrupole, they think it will take about an hour.
Entry  Thu Apr 3 02:52:27 2025, Zac, Johan, General, Beam is back at 02:52 
 
Entry  Thu Apr 3 05:11:37 2025, Zac, Johan, General, Beam lost at 05:07, returned at 05:14 
 
Entry  Thu Apr 3 06:16:32 2025, JEL, ZN, General, Screenshots 2025-04-03_06-15-12-250.png2025-04-03_06-15-00-458.png2025-04-03_06-14-54-153.png
Stable since last entry
Entry  Thu Apr 3 06:33:08 2025, Zac, Johan, General, Beam lost at 06:27, returned at 06:34 
Spike in beam intensity at 06:27 (5x usual intensity) and then beam is lost. HKR says it's a problem with the magnet's power supply. Once the beam returned, the peaks are shifted to the left but are slowly shifting back into position.
Entry  Thu Apr 3 07:59:09 2025, ZP, CN, ID, General, Screenshots 2025-04-03_07-58-00-874.png2025-04-03_07-57-08-478.png2025-04-03_07-57-36-781.png
Screenshots before opening ESR.
Entry  Thu Apr 3 09:34:42 2025, ID, General, Finished in the ESR as of 9:05 
We had stopped the RSAs at 8:00 (call for restart)
Time stamp computer stopped and started at 9:35
ELOG V3.1.5-fc6679b