HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 5 of 17  Not logged in ELOG logo
Entry  Tue Apr 8 09:28:49 2025, Team PLEIADES, General, Controlled access to ESR to connect cables for DAQ 
We will need to enter the ESR to connect the cables again for our DAQ and then drive in the outside detector for 20min to get some data.
9:35 entered
9:41 exit
Entry  Tue Apr 8 09:53:04 2025, Team PLEIADES, Detectors, Moving outside particle detector in for 20min 
9:53 Data taking with outside detector (GE01DD2AG) moved in to -110mm
Entry  Tue Apr 8 10:13:51 2025, Team PLEIADES, Detectors, Moved outside particle detector back into parking position 
10:16 Moved outside particle detector back into parking position (-126mm)
Entry  Tue Apr 8 11:37:13 2025, Team PLEIADES, Detectors, PLEIADES 2025-04-08_11-38-37-375.png
11:37 Outside particle detector (GE01DD2AG) moved in to -100mm to take data
Entry  Tue Apr 8 11:57:56 2025, Team PLEIADES, Detectors, Outside detector moved out 
12:00 Outside particle detector moved out to parking position again (-125 mm)
Entry  Sun Apr 6 19:42:23 2025, Taka, Moriguchi, General, Lessie screenshots 2025-04-06_19-39-39-090.png2025-04-06_19-39-53-458.png2025-04-06_19-40-16-550.png2025-04-06_19-40-25-695.png
 
Entry  Sun Apr 6 20:13:03 2025, Taka, Moriguchi, Accelerator, Beam sharing 
Now we have every injection.
Entry  Sun Apr 6 21:12:07 2025, Taka, Moriguchi, General, Lassie screenshots 2025-04-06_21-09-47-795.png2025-04-06_21-09-59-394.png2025-04-06_21-10-18-273.png2025-04-06_21-10-25-132.png
 
Entry  Sun Apr 6 21:29:37 2025, Taka, Moriguchi, Accelerator, Beam sharing 
again, ESR : FRS = 1 : 1
Entry  Sun Apr 6 22:22:46 2025, Taka, Moriguchi, General, Lassie screenshots 2025-04-06_22-19-18-537.png2025-04-06_22-19-44-841.png2025-04-06_22-20-07-256.png2025-04-06_22-20-18-305.png
 
Entry  Mon Apr 7 07:04:06 2025, Siddharth, Dima, Jelena, Guy, General, Lassie screenshots 2025-04-07_07-02-49-560.png2025-04-07_07-02-45-488.png2025-04-07_07-02-20-272.png2025-04-07_07-02-10-434.png
 
Entry  Mon Apr 7 03:25:41 2025, Siddharth, Dima , Collaboration, mesycontrol does not start GUI Screenshot_2025-04-07_03-32-02.png
mesycontrol process starts but shows no GUI at all.

Around 02:51 we wanted to record leakage currents for PLEIADES. 
Entry  Sun Apr 6 23:51:33 2025, Siddharth, Dima, Simulations, LISE file for the 192Pb setting New_TEline2022-ESR-192Pb-208Pb-nostripper_524MeV.lpp
 
Entry  Sun Apr 6 23:59:09 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-06_23-57-28-607.png2025-04-06_23-57-33-514.png2025-04-06_23-58-13-724.png2025-04-06_23-58-04-511.png
 
Entry  Mon Apr 7 01:05:11 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_01-03-11-507.png2025-04-07_01-03-06-776.png2025-04-07_01-03-42-954.png2025-04-07_01-03-34-120.png
 
Entry  Mon Apr 7 02:02:47 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_02-01-21-570.png2025-04-07_02-01-15-734.png2025-04-07_02-00-59-591.png2025-04-07_02-00-50-490.png
 
Entry  Mon Apr 7 02:56:47 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_02-55-22-358.png2025-04-07_02-55-17-013.png2025-04-07_02-55-02-297.png2025-04-07_02-54-55-500.png
 
Entry  Mon Apr 7 03:58:58 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_03-57-43-143.png2025-04-07_03-57-37-106.png2025-04-07_03-57-20-746.png2025-04-07_03-57-12-633.png
 
Entry  Mon Apr 7 05:04:59 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_05-03-04-096.png2025-04-07_05-02-59-917.png2025-04-07_05-02-43-900.png2025-04-07_05-02-37-096.png
 
Entry  Mon Apr 7 06:09:30 2025, Siddharth, Dima, General, Lassie screenshots 2025-04-07_06-08-07-034.png2025-04-07_06-08-00-184.png2025-04-07_06-07-41-005.png2025-04-07_06-07-15-820.png
FRS started taking beam from 6:00 Am
ELOG V3.1.5-fc6679b