HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 6 of 9  Not logged in ELOG logo
ID Date Authordown Category Subject
  28   Tue Apr 1 05:29:45 2025 MichaelGeneralLassie Monitor 2025-04-01_05-29-01-845_tcl1064.png
Attachment 1: 2025-04-01_05-29-01-845_tcl1064.png
2025-04-01_05-29-01-845_tcl1064.png
  29   Tue Apr 1 05:58:51 2025 MichaelGeneralLassie Monitor 2025-04-01_05-58-09-122_tcl1064.png
Attachment 1: 2025-04-01_05-58-09-122_tcl1064.png
2025-04-01_05-58-09-122_tcl1064.png
  30   Tue Apr 1 06:31:46 2025 MichaelGeneralLassie Monitor 2025-04-01_06-31-10-211_tcl1064.png
Attachment 1: 2025-04-01_06-31-10-211_tcl1064.png
2025-04-01_06-31-10-211_tcl1064.png
  152   Fri Apr 4 11:48:37 2025 MG, NH, IDGeneralsetting change to 186Hf + Lassie screenshots
186Hf, 510MeV/u of 208Pb beam, ecooling not working 
Attachment 1: 2025-04-04_11-51-48-660.png
2025-04-04_11-51-48-660.png
Attachment 2: 2025-04-04_11-52-41-057.png
2025-04-04_11-52-41-057.png
Attachment 3: 2025-04-04_11-54-16-558.png
2025-04-04_11-54-16-558.png
  153   Fri Apr 4 14:01:20 2025 MG, ID,NHGeneralScreen shot
Lassie screen shots 186Hf
Attachment 1: 2025-04-04_13-57-43-428.png
2025-04-04_13-57-43-428.png
Attachment 2: 2025-04-04_13-57-48-930.png
2025-04-04_13-57-48-930.png
Attachment 3: 2025-04-04_13-56-37-564.png
2025-04-04_13-56-37-564.png
  159   Fri Apr 4 16:59:25 2025 KK BJDAQLassie screen shots
Attachment 1: 2025-04-04_16-57-35-759.png
2025-04-04_16-57-35-759.png
Attachment 2: 2025-04-04_16-57-28-066.png
2025-04-04_16-57-28-066.png
Attachment 3: 2025-04-04_16-56-54-385.png
2025-04-04_16-56-54-385.png
  51   Tue Apr 1 21:05:20 2025 Jeroen, Zac, Esther, Shahab, WolframDAQChange of settings for shorter acq. window
> Acquisition stopped at 20:36. 
> 
> First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq
> 
> Last file from this setting: RSA01-2025.04.01.20.36.54.257.tiq
> 
> acq. length changed to 500 ms
> 
> acq bw changed to 50 MHz
> 
> ==> 12 MSamples
> 
> Trigger window condition set to 50%.
> 
> First file from this setting: RSA01-2025.04.01.20.45.40.053.tiq
> 
> Analysis setting the the frame length 2^16 and frame number = 190.

Last file from previous setting: RSA01-2025.04.01.21.06.30.580.tiq

Changed the RSA01,02 to 50 MSamples/s (20nsec/sample) for 500.00 ms acq. length, 25 MHz acq. BW, 33% trigger position.

First good file from this time: 21:37 04.01.2025 -- RSA01-2025.04.01.21.37.13.721.tiq
  52   Tue Apr 1 22:03:07 2025 Jeroen, Zac, Esther, Shahab, WolframDAQOptimisation of settings
Estimation of potential gain by changing. Files from this points are going to rubbish. Potential gains are c. 20% 

22:04: The current acquisition window is recording for 2.9 s. And is not recording for 3.9 s. We are running currently with a spill cycle of 5s every repetition.

22:22 The spill cycle between each injection was changed to 4->3->2s progressively and FRS also stopped taking spills so we settled on 2s spill request.

In the morning the spill request has to be changed back to 5s when the FRS goes back into operation.

new file with the setting is

RSA01-2025.04.01.22.19.06.761.tiq

[analysis]
nframes = 190
lframes = 65536
navg = 1
  47   Tue Apr 1 20:00:14 2025 Jeroen, Zac, EstherAcceleratorBeam fell out
No beam from 19:57:41.
  48   Tue Apr 1 20:02:19 2025 Jeroen, Zac, EstherAcceleratorBeam fell out
> No beam from 19:57:41.

Beam back from 20:02
  49   Tue Apr 1 20:19:23 2025 Jeroen, Zac, EstherAcceleratorBeam fell out
> > No beam from 19:57:41.
> 
> Beam back from 20:02
Attachment 1: 2025-04-01_20-17-10-651_tcl1064.png
2025-04-01_20-17-10-651_tcl1064.png
  44   Tue Apr 1 16:44:32 2025 Jeroen, EstherGeneralNo SIS beam since 14:35
Beam resumed at 16:40. 
Attachment 1: 2025-04-01_16-47-13-677_tcl1146.png
2025-04-01_16-47-13-677_tcl1146.png
Attachment 2: 2025-04-01_16-47-10-870_tcl1146.tdf
  50   Tue Apr 1 20:37:04 2025 JeroenDAQChange of settings for shorter acq. window
Acquisition stopped at 20:36. 

First file from this setting: RSA01-2025.04.01.03.52.59.247.tiq

Last file from this setting: RSA01-2025.04.01.20.36.54.257.tiq

acq. length changed to 500 ms

acq bw changed to 50 MHz

==> 12 MSamples

Trigger window condition set to 50%.

First file from this setting: RSA01-2025.04.01.20.45.40.053.tiq

Analysis setting the the frame length 2^16 and frame number = 190.
  31   Tue Apr 1 06:53:51 2025 Jelena B,SiddharthGeneralLassie Monitor
Attachment 1: 2025-04-01_06-49-59-989_tcl1064.png
2025-04-01_06-49-59-989_tcl1064.png
  32   Tue Apr 1 08:36:25 2025 Jelena B, SiddharthGeneralLassie 2025-04-01_08-37-32-155_tcl1064.png
Attachment 1: 2025-04-01_08-37-32-155_tcl1064.png
2025-04-01_08-37-32-155_tcl1064.png
  33   Tue Apr 1 10:03:56 2025 Jelena B, SiddharthGeneralTechnical issue with SIS18
From HKR info: there is a technical issue with SIS18 and we will have no beam for next 25 minutes. 
Attachment 1: 2025-04-01_10-02-16-454_tcl1064.png
2025-04-01_10-02-16-454_tcl1064.png
  34   Tue Apr 1 10:34:20 2025 Jelena B, SiddharthGeneralResolved issue with SIS18
Beam is back with some fluctuations.
We did not have beam from 9:34 until 10:08, around 35 minutes. 
Attachment 1: 2025-04-01_10-33-38-948_tcl1064.png
2025-04-01_10-33-38-948_tcl1064.png
  35   Tue Apr 1 11:47:14 2025 Jelena B, SiddharthGeneralLassie 2025-04-01_11-46-35-517_tcl1064.png
Attachment 1: 2025-04-01_11-46-35-517_tcl1064.png
2025-04-01_11-46-35-517_tcl1064.png
  36   Tue Apr 1 12:58:27 2025 Jelena B, SiddharthGeneralLassie
Attachment 1: 2025-04-01_12-57-50-275_tcl1064.png
2025-04-01_12-57-50-275_tcl1064.png
  37   Tue Apr 1 14:02:23 2025 Jelena B, SiddharthGeneralLassie
Attachment 1: 2025-04-01_14-01-37-464_tcl1064.png
2025-04-01_14-01-37-464_tcl1064.png
ELOG V3.1.5-fc6679b