HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  masses & isomeres 2025, Page 7 of 17  Not logged in ELOG logo
Entry  Sat Apr 5 17:26:48 2025, Team PLEIADES, Detectors, Outside pocket "repair" 
We tried to convince the outside pocket to move, no success. We can hear the "hissing sound" of the pressurized air but no movement. Sergey tried to move it from the HKR, also no success. After that I tried to move it again from the Messhuette...and the "Out of tolerance" error message is gone, and the pocket seems to move. (We cannot confirm from inside because the ESR is already closed).
Guess the outside pocket got intimidated by Sergey and decided to get moving again... ;-)

We will take a bit more beam once the setting is stable, but try not to fry another detector.
Entry  Sat Apr 5 19:20:32 2025, Team PLEIADES, Detectors, Outside detector moved out again 
19:20 The outside and inside PLEIADES detectors are both moved back into their parking positions. Shifts should continue monitoring the leakage current on the mesycontrol screens and enter the values every 2h in the Google spreadsheet:
https://elog.gsi.de/esr/Beavertail/34
Entry  Tue Apr 8 11:57:56 2025, Team PLEIADES, Detectors, Outside detector moved out 
12:00 Outside particle detector moved out to parking position again (-125 mm)
Entry  Tue Apr 1 22:03:07 2025, Jeroen, Zac, Esther, Shahab, Wolfram, DAQ, Optimisation of settings 
Estimation of potential gain by changing. Files from this points are going to rubbish. Potential gains are c. 20% 

22:04: The current acquisition window is recording for 2.9 s. And is not recording for 3.9 s. We are running currently with a spill cycle of 5s every repetition.

22:22 The spill cycle between each injection was changed to 4->3->2s progressively and FRS also stopped taking spills so we settled on 2s spill request.

In the morning the spill request has to be changed back to 5s when the FRS goes back into operation.

new file with the setting is

RSA01-2025.04.01.22.19.06.761.tiq

[analysis]
nframes = 190
lframes = 65536
navg = 1
Entry  Wed Apr 2 23:15:52 2025, Zac, Johan, Accelerator, No injections from SIS 
Night shift starts with no injections from SIS! We still have triggers; we called HKR and are waiting for response.
Entry  Wed Apr 2 10:05:06 2025, Michael, Alex, Yuri, Accelerator, No beam since 09:59 
The SIS kicker has failed again.
Entry  Wed Apr 2 10:55:16 2025, Michael, Alex, Wolfram, Accelerator, No beam in the ESR 
Since few minutes do not see any beam in the ESR (on RSAs). There is beam in SIS and injection requests from the ESR seem to be there as well.
Entry  Wed Apr 2 13:27:52 2025, Michael, Alex, Maeve, Accelerator, No beam in the ESR 
There is no beam in the ESR since couple of minutes. According to the info from HKR, the experts started to repair the magnets (power supplies) used for extraction and transfer of the beam from SIS to ESR. It is estimated to take about 1 hour.
Entry  Wed Apr 2 08:04:47 2025, Michael, Alex, General, No beam  
The SIS kicker has failed again at 08:01.
Since this has happened already few times, the experts from the on-call duty service are now looking at the problem.
Entry  Tue Apr 1 14:54:24 2025, all, General, No SIS beam since 14:35 
 
    Reply  Tue Apr 1 16:44:32 2025, Jeroen, Esther, General, No SIS beam since 14:35 2025-04-01_16-47-13-677_tcl1146.png2025-04-01_16-47-10-870_tcl1146.tdf
Beam resumed at 16:40. 
Entry  Sat Apr 5 17:57:08 2025, Ragan, Dima, Zac, Shahab, Calibration, New Settings Resonators 
New settings for resonators:

410: plunger stay the same
center: 411.756955 MHz


245: plunger now at 150
center: 245.507668 MHz


first files on the resonators:


RSA01-2025.04.05.18.09.08.519.tiq
RSA02-2025.04.05.18.09.09.618.tiq
Entry  Mon Apr 7 17:26:57 2025, Shahab, Oliver, DAQ, New DAQ Settings 2025-04-07_16-57-16-424.png2025-04-07_17-15-22-069.png
new DAQ Settings for the RSAs:

414475588 (192Pb+82   at 214 harmonic)
244.03689

plunger settings: 410 MHz cavity--> 8
245MHz cavity --> 350


recording at 50 MSPS
2^16 points each frame -->  1ms per frame

Average set to: 5 frames --> total of ca. 6.5 ms per average frame

first good NPZ file from this settings on RSAs starts from 17:41
Entry  Wed Apr 2 16:28:14 2025, SS, ID, HA etc, DAQ, NTCAP stop/start 
NTCAP was stopped and restarted.
Entry  Mon Mar 31 17:46:21 2025, Esther, DAQ, NTCAP scaler assignment 
The setup contains two NI-6612 I/O cards with BNC-2121 connector accessories that provide eight inputs each for TTL scaler signals.
Important: When connecting scaler signals make sure that they are TTL (not NIM)!

Additionally, there is the possibility to assign data streams (eg clocks) from other modules in the NI chassis to scaler channels.
Below you find the assignment of the channels on the software side, including the internal clocks. This is important when analysing the .tmds files.

ChannelInputComment
010 MHz clockexternal (from NI 6674T timing module)
1DC trafoion current in ESR
2injection triggerfrom Genesys (IO2 on sddsc221)
3U-coolercooler voltage
4I-coolercooler electron current
5P-gunpressure at e-cooler
6100 kHz clockinternal
720 MHz clockinternal
8software triggerfrom Detectomer
9PLEIADES outside
9PLEIADES inside
Entry  Sun Apr 6 16:24:36 2025, Wolfram, Shahab, Moriguchi, Taka, DAQ, NTCAP restart 
NTCAP restarted with new timestamp.
Entry  Wed Apr 9 11:18:27 2025, Esther, DAQ, NTCAP off, RSA triggers disconnected 
The NTCAP computer and crate are switched off.
The triggers are disconnected from the RSAs, but they remain on.
Entry  Tue Apr 1 15:32:59 2025, Zac, DAQ, NTCAP Restarted 
NTCAP Has been restarted (we restart every day around 15:00 so data goes in a new folder)
Entry  Fri Apr 4 01:12:03 2025, Shahab, Analysis, NPZ add up script summed_spectrogram_time_cut.pngsummed_spectrogram.png
Since there are many NPZ summer scripts around, I thought I would also share mine. This one takes advantage of the power of filelists and has a progress bar. Creating file lists gives you more control over the range of analyzed data, for example, the command:

find /data.local/G22-00018_00203/results/analyzers/RSA02 -name "RSA02-2025.04.04.01.??.??.???.tiq_spectrogram.npz" > filelist.txt

makes a file list of everything file that was produced during the second hour of the morning of the April 4th. You can fine tune the wildcards according to the time range you are interested in.


then just call the script by:

python npz_addup.py filelist.txt

you can also provide time cuts, like this:

python npz_addup.py --time-cut 0.14 filelist.txt

which will cut away first 0.14 seconds of the spectrogram. Without time cuts, it will do over the whole range.


It creates 4 type of files:

summed_spectrum.npz --> for use with RionID for PID
summed_spectrogram.npz --> for general use / analysis
summed_spectrum.png --> for general view
summed_spectrogram.png --> for detailed view

if time-cut is provided, the filenames will have a "_time_cut" suffix at the end.


Here is the link to the script:

https://github.com/xaratustrah/e0018_e0203_scripts/blob/main/npz_addup.py

examples are in attachment:
Entry  Tue Apr 8 09:53:04 2025, Team PLEIADES, Detectors, Moving outside particle detector in for 20min 
9:53 Data taking with outside detector (GE01DD2AG) moved in to -110mm
ELOG V3.1.5-fc6679b