ID Date Author Category Subjectdown Text Attachments
  206   Sat Apr 5 17:26:48 2025 Team PLEIADESDetectorsOutside pocket "repair"We tried to convince the outside pocket to
move, no success. We can hear the "hissing
sound" of the pressurized air but no movement.
  
  212   Sat Apr 5 19:20:32 2025 Team PLEIADESDetectorsOutside detector moved out again19:20 The outside and inside PLEIADES detectors
are both moved back into their parking positions.
Shifts should continue monitoring the leakage
  
  311   Tue Apr 8 11:57:56 2025 Team PLEIADESDetectorsOutside detector moved out12:00 Outside particle detector moved out
to parking position again (-125 mm)
  
  52   Tue Apr 1 22:03:07 2025 Jeroen, Zac, Esther, Shahab, WolframDAQOptimisation of settingsEstimation of potential gain by changing.
Files from this points are going to rubbish.
Potential gains are c. 20% 
  
  96   Wed Apr 2 23:15:52 2025 Zac, JohanAcceleratorNo injections from SISNight shift starts with no injections from
SIS! We still have triggers; we called HKR
and are waiting for response.
  
  74   Wed Apr 2 10:05:06 2025 Michael, Alex, YuriAcceleratorNo beam since 09:59The SIS kicker has failed again.   
  76   Wed Apr 2 10:55:16 2025 Michael, Alex, WolframAcceleratorNo beam in the ESRSince few minutes do not see any beam in the
ESR (on RSAs). There is beam in SIS and injection
requests from the ESR seem to be there as
  
  80   Wed Apr 2 13:27:52 2025 Michael, Alex, MaeveAcceleratorNo beam in the ESRThere is no beam in the ESR since couple of
minutes. According to the info from HKR,
the experts started to repair the magnets
  
  70   Wed Apr 2 08:04:47 2025 Michael, AlexGeneralNo beam The SIS kicker has failed again at 08:01.
Since this has happened already few times,
the experts from the on-call duty service
  
  41   Tue Apr 1 14:54:24 2025 allGeneralNo SIS beam since 14:35    
  44   Tue Apr 1 16:44:32 2025 Jeroen, EstherGeneralNo SIS beam since 14:35Beam resumed at 16:40.   2025-04-01_16-47-13-677_tcl1146.png2025-04-01_16-47-10-870_tcl1146.tdf 
  209   Sat Apr 5 17:57:08 2025 Ragan, Dima, Zac, ShahabCalibrationNew Settings ResonatorsNew settings for resonators:

410: plunger stay the same
  
  284   Mon Apr 7 17:26:57 2025 Shahab, OliverDAQNew DAQ Settingsnew DAQ Settings for the RSAs:

414475588 (192Pb+82   at 214 harmonic)
 2025-04-07_16-57-16-424.png2025-04-07_17-15-22-069.png 
  84   Wed Apr 2 16:28:14 2025 SS, ID, HA etcDAQNTCAP stop/startNTCAP was stopped and restarted.   
  10   Mon Mar 31 17:46:21 2025 EstherDAQNTCAP scaler assignmentThe setup contains two NI-6612 I/O cards with
BNC-2121 connector accessories that provide
eight inputs each for TTL scaler signals.
  
  237   Sun Apr 6 16:24:36 2025 Wolfram, Shahab, Moriguchi, TakaDAQNTCAP restartNTCAP restarted with new timestamp.   
  329   Wed Apr 9 11:18:27 2025 EstherDAQNTCAP off, RSA triggers disconnectedThe NTCAP computer and crate are switched
off.
The triggers are disconnected from the RSAs,
  
  42   Tue Apr 1 15:32:59 2025 ZacDAQNTCAP RestartedNTCAP Has been restarted (we restart every
day around 15:00 so data goes in a new folder)
  
  137   Fri Apr 4 01:12:03 2025 ShahabAnalysisNPZ add up scriptSince there are many NPZ summer scripts around,
I thought I would also share mine. This one
takes advantage of the power of filelists
 summed_spectrogram_time_cut.pngsummed_spectrogram.png 
  306   Tue Apr 8 09:53:04 2025 Team PLEIADESDetectorsMoving outside particle detector in for 20min9:53 Data taking with outside detector (GE01DD2AG)
moved in to -110mm
  