HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 7 of 17  Not logged in ELOG logo
Entry  Sat Apr 5 17:26:48 2025, Team PLEIADES, Detectors, Outside pocket "repair" 
Entry  Sat Apr 5 19:20:32 2025, Team PLEIADES, Detectors, Outside detector moved out again 
Entry  Tue Apr 8 11:57:56 2025, Team PLEIADES, Detectors, Outside detector moved out 
Entry  Tue Apr 1 22:03:07 2025, Jeroen, Zac, Esther, Shahab, Wolfram, DAQ, Optimisation of settings 
Entry  Wed Apr 2 23:15:52 2025, Zac, Johan, Accelerator, No injections from SIS 
Entry  Wed Apr 2 10:05:06 2025, Michael, Alex, Yuri, Accelerator, No beam since 09:59 
Entry  Wed Apr 2 10:55:16 2025, Michael, Alex, Wolfram, Accelerator, No beam in the ESR 
Entry  Wed Apr 2 13:27:52 2025, Michael, Alex, Maeve, Accelerator, No beam in the ESR 
Entry  Wed Apr 2 08:04:47 2025, Michael, Alex, General, No beam  
Entry  Tue Apr 1 14:54:24 2025, all, General, No SIS beam since 14:35 
    Reply  Tue Apr 1 16:44:32 2025, Jeroen, Esther, General, No SIS beam since 14:35 2025-04-01_16-47-13-677_tcl1146.png2025-04-01_16-47-10-870_tcl1146.tdf
Entry  Sat Apr 5 17:57:08 2025, Ragan, Dima, Zac, Shahab, Calibration, New Settings Resonators 
Entry  Mon Apr 7 17:26:57 2025, Shahab, Oliver, DAQ, New DAQ Settings 2025-04-07_16-57-16-424.png2025-04-07_17-15-22-069.png
Entry  Wed Apr 2 16:28:14 2025, SS, ID, HA etc, DAQ, NTCAP stop/start 
Entry  Mon Mar 31 17:46:21 2025, Esther, DAQ, NTCAP scaler assignment 
Entry  Sun Apr 6 16:24:36 2025, Wolfram, Shahab, Moriguchi, Taka, DAQ, NTCAP restart 
Entry  Wed Apr 9 11:18:27 2025, Esther, DAQ, NTCAP off, RSA triggers disconnected 
Entry  Tue Apr 1 15:32:59 2025, Zac, DAQ, NTCAP Restarted 
Entry  Fri Apr 4 01:12:03 2025, Shahab, Analysis, NPZ add up script summed_spectrogram_time_cut.pngsummed_spectrogram.png
Entry  Tue Apr 8 09:53:04 2025, Team PLEIADES, Detectors, Moving outside particle detector in for 20min 
ELOG V3.1.5-fc6679b