HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
Bound beta decay experiment on Tl-205, Page 9 of 9
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
SlowControl
180 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ID
Date
Author
Category
Subject
Text
164
Mon Apr 6 05:43:50 2020
Ragan, Laszlo, Nikos
Runs
One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
165
Mon Apr 6 08:37:02 2020
Ragan, Shahab, Pierre-Michel
Runs
10 hour measurement (S2: 0/35 mm and S6: -20/7 mm)
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
8x
166
Mon Apr 6 09:34:58 2020
Shahab
Runs
Pictures from one and a half hour measurement
cheers!
167
Mon Apr 6 14:17:54 2020
Yuri, Shahab
Runs
FRS valves
We saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum
168
Mon Apr 6 14:57:04 2020
Shahab
Runs
cooler down
cooler component GECEBG2T again had to be
reset.
169
Mon Apr 6 20:03:50 2020
Ragan
General
Experiment finished ))
E121 experiment is finished with the last
10 hours measurement at 19:47 ))
Many thanks to everyone for there significant
170
Thu Apr 9 11:16:35 2020
Ragan
General
Measurements done in the experiment
171
Thu Apr 9 11:47:28 2020
ruijiu
backup data
2020.4.8 12:00Started copying
data。
2020.4.9 11:52 Copied 6.3TB
172
Fri Apr 17 18:27:34 2020
ruijiu
Analysis
backup data
1.connect USB harddisk to computer lxg1254
and copy data to sever.
173
Mon Apr 20 11:17:18 2020
Ragan
General
Logbook
174
Wed Aug 5 17:19:16 2020
Rui-Jiu Chen
Analysis
Data structure
175
Thu Oct 1 22:20:03 2020
Jan
DAQ
final unpacker config
We identified an issue with randomly missing
adc channels in all lmd-files before run
0273.
176
Mon Nov 2 16:45:55 2020
Jan
DAQ
f_user & mbslog
Attached is the f_user.c and the mbslog.l
files.
The readout function is for the following
177
Thu Nov 5 15:13:43 2020
Jan
Analysis
root script example
Attached is an example root script/macro that
shows how to use scripts for analysis.
178
Thu Nov 19 09:14:40 2020
Jan
Detectors
remote MSCF settings for CsISiPHOS
Attached is a list of all set values for the
5 MSCF shaper modules.
This was done prior to run0251, which served
180
Tue Dec 8 15:47:07 2020
Jan
Detectors
manual preamp & shaper settings for CsISiPhos
attached is a document showing fotos of all
involved amplifiers in the chain to document
the manual settings active during the experiment.
181
Tue Dec 15 09:25:41 2020
Jan
DAQ
SiCsIPhos signal/amplitude reconstruction
182
Mon Mar 29 16:31:09 2021
Pierre-Michel
DAQ
cross section
(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8
= 1.29595
183
Sun May 30 12:09:00 2021
Ragan
General
NTCAP
Attached is the info given by Carsten.
The instructions to operate NTCAP are given
on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
184
Wed Aug 25 15:13:41 2021
Jan
DAQ
SC13 clock frequency
The frequency of the clock used as reference
in scaler channel 13 has been measured precisely.
In contrast to what was expected (1.5MHz
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ELOG V3.1.5-fc6679b