HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 104     Entry time: Mon Mar 30 23:30:35 2020
Author: Jan 
Category: Analysis 
Subject: run251 - Si-pad performance & status 
Attached are plots for Si-pad 2 with hits from ionization of 206Pb81+ at the target.
The plots are representative for all Si-pads, the pattern is always the same!

y-axis: E n-side
x-axis: E p-side strip
condition: E_gate on peak in CsI

While strips 1, 2 and 7 look fine, strips 3 and 6 show already signs of degradation. 
For strips 4 and 5, it is clearly visible that something is wrong.
Those are the central strips, which probably see the most rate.

The same dataset was analyzed here: https://elog.gsi.de/esr/E121/62

This might be a hint to a radiation damage or to the fact that we operate at too low bias voltage (32 Volt).
Maybe it recovers if we increase bias to 60 Volt.
Attachment 1: 251_Epad2_n_vs_p1.png  13 kB  Uploaded Tue Mar 31 00:30:59 2020  | Hide | Hide all
251_Epad2_n_vs_p1.png
Attachment 2: 251_Epad2_n_vs_p2.png  13 kB  Uploaded Tue Mar 31 00:31:06 2020  | Hide | Hide all
251_Epad2_n_vs_p2.png
Attachment 3: 251_Epad2_n_vs_p3.png  13 kB  Uploaded Tue Mar 31 00:31:11 2020  | Hide | Hide all
251_Epad2_n_vs_p3.png
Attachment 4: 251_Epad2_n_vs_p4.png  16 kB  Uploaded Tue Mar 31 00:31:16 2020  | Hide | Hide all
251_Epad2_n_vs_p4.png
Attachment 5: 251_Epad2_n_vs_p5.png  16 kB  Uploaded Tue Mar 31 00:31:31 2020  | Hide | Hide all
251_Epad2_n_vs_p5.png
Attachment 6: 251_Epad2_n_vs_p6.png  15 kB  Uploaded Tue Mar 31 00:31:36 2020  | Hide | Hide all
251_Epad2_n_vs_p6.png
Attachment 7: 251_Epad2_n_vs_p7.png  14 kB  Uploaded Tue Mar 31 00:31:44 2020  | Hide | Hide all
251_Epad2_n_vs_p7.png
ELOG V3.1.5-fc6679b