HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 116     Entry time: Thu Apr 2 05:00:44 2020
Author: Ragan, Esther, Oliver 
Category: Runs 
Subject: Second measurement with 2 hrs storage time 
Electron cooler was off here. Thus, this measurement is not what we needed.
(in the picture below, it can be seen that the beam is not cooled)


beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 2 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

_______________________________________________________________________________

time when accumulation starts: 04:45
time when storage starts: 04:55
time when storage ends: 06:55
I_cooler during storage time: 10 mA

I_cooler =  mA


I_SIS: 1.8e9      
ESR particles after stacking: ~e5  
Number of stackings: 20
Target ON density:   4e12
Target on time: 06:56:30
Target off time: 07:06:30
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg  1.878 MB  Uploaded Thu Apr 2 16:29:14 2020  | Hide | Hide all
734CA93E-95FD-4C6E-8E90-8DCD961E4352.jpeg
ELOG V3.1.5-fc6679b