HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 117     Entry time: Thu Apr 2 06:25:13 2020
Author: Ragan 
Category: Runs 
Subject: Template 
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: ___ hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at ___ , first file: run____.lmd
file running:    ____.lmd

_______________________________________________________________________________

time when accumulation starts: __:__
time when storage starts:  __:__
time when storage ends:  __:__
I_cooler during storage time: __ mA

I_cooler =  __ mA


I_SIS: ___      
ESR particles after stacking: ___ 
Number of stackings: __
Target ON density:   _____
Target on time: __:__
Target off time: __:__
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01______________
\IQ_2020-04-01_____________
IQ rate: 8 MS/s
(saved in drive : __)

copy and repeat the above (below the line) for every storage time measurement
ELOG V3.1.5-fc6679b