HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 118     Entry time: Thu Apr 2 07:01:32 2020
Author: Ragan, Esther, Oliver 
Category: Runs 
Subject: Measurement with 4 hrs storage time 
beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 4 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 01:48 , first file: run0287.lmd
file running:    0287.lmd

_______________________________________________________________________________

time when accumulation starts: 04:45
time when storage starts: 04:55
time when storage ends: 06:55
I_cooler during storage time: 10 mA

I_cooler =  mA


I_SIS: 1.8e9      
ESR particles after stacking: ~e5  
Number of stackings: 20
Target ON density:   4e12
Target on time: 06:56:30
Target off time: 07:06:30
Target on time for measurement: 10 mins (by local mode)       


NTCAp file:
SC_2020-04-01_16-36-43/0000xxx.iq.tdms
\IQ_2020-04-01_16-36-43/0000xxx.iq.tdms
IQ rate: 8 MS/s
(saved in drive : o)

copy and repeat the above (below the line) for every storage time measurement
ELOG V3.1.5-fc6679b