HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 119     Entry time: Thu Apr 2 09:21:19 2020
Author: Ruijiu 
Category: Runs 
Subject: 2nd measurement with 2 hrs storage time (repeat) 
Because the electron cooler was not switched on during beam accumulation in the previous measurement, we repeat this measurement again.
(In the picture below, it can be seen that the beam cooled. On right most is the Tl beam and rest are the contaminants.)

beam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: 2 hrs

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):       mm

run start at 08:46 , first file: run290.lmd
file running:   run290.lmd


time when accumulation starts: 09:06
time when storage starts:  09:16
time when storage ends:  10:59
I_cooler during storage time: 10 mA

I_cooler =  __ mA


I_SIS: 1.7e9      
ESR particles after stacking: 1e6
Number of stacking: 20
Target ON density:   3.9e12 atoms/cm2
Target on time:  11:00
Target off time: 11:10
Target on time for measurement: 10 
mins (by local mode)       


NTCAp file:
SC_2020-04-02_07-10-40
\IQ_2020-04-02_07-11-48
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the 
line) for every storage time 
measurement
Attachment 1: IMG_20200402_092631.jpg  2.499 MB  Uploaded Thu Apr 2 10:27:50 2020  | Show | Show all
ELOG V3.1.5-fc6679b