HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 122     Entry time: Thu Apr 2 21:03:40 2020
Author: Ragan, Yuri, Sergey, Nikos 
Category: Runs 
Subject: Zero hour measurement (S2:-10/35 mm) 
beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: zero hrs
S2:-10/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd (File was started when stacking was ongoing. Maybe not all the stackings could be sen in the analysis.)
file running: 0292.lmd

_______________________________________________________________________________

time when accumulation starts: --
time when storage starts: 19:10
time when storage ends: 19:10
I_cooler during storage time: --

I_cooler =  177 mA


I_SIS: 2.2e9      
ESR particles after stacking: 3.5e6   (offset 1e5)
Number of stackings: ~40 (can be checked on NTCap data)
Target ON density: 3.45e12 
Target on time for measurement: 10 mins (by event mode)       


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
ELOG V3.1.5-fc6679b