HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 124     Entry time: Thu Apr 2 21:12:39 2020
Author: Ragan, Nikos, Pierre-Michel, Dima 
Category: Runs 
Subject: Three hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hrs
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd 
file running: 0295.lmd

_______________________________________________________________________________

time when accumulation starts: 20:37
time when storage starts: 20:51
time when storage ends: 23:51
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.75e9      
ESR particles after stacking: 2e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.48e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 46CBD7E3-0AF1-447C-847E-31BA5224684D.jpeg  2.818 MB  Uploaded Fri Apr 3 02:28:38 2020  | Show | Show all
Attachment 2: 7A404038-88E9-4CAF-91E3-A26A0F8A51EF.jpeg  1.763 MB  Uploaded Fri Apr 3 02:29:37 2020  | Show | Show all
ELOG V3.1.5-fc6679b