HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 125     Entry time: Fri Apr 3 00:39:07 2020
Author: Ragan, Pierre-Michel, Dima 
Category: Runs 
Subject: Half hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd 
file running: 0295.lmd

_______________________________________________________________________________

time when accumulation starts: 12:08
time when storage starts: 12:25
time when storage ends: 12:55
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 2e9      
ESR particles after stacking: 8.2e5 (offset 1e5)
Number of stackings: 9
Target ON density: 3.45e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: CC419497-E2AA-4C71-92AD-7F282775FFC2.jpeg  2.970 MB  Uploaded Fri Apr 3 02:26:29 2020  | Hide | Hide all
CC419497-E2AA-4C71-92AD-7F282775FFC2.jpeg
Attachment 2: AB10D6CB-87FC-4D9E-9AF0-AA9279D62066.jpeg  2.292 MB  Uploaded Fri Apr 3 02:27:32 2020  | Hide | Hide all
AB10D6CB-87FC-4D9E-9AF0-AA9279D62066.jpeg
ELOG V3.1.5-fc6679b