HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 128     Entry time: Fri Apr 3 03:19:46 2020
Author: Ragan, Pierre-Michel, Dima 
Category: Runs 
Subject: Half hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:05 , first file: run0292.lmd 
file running: 0298.lmd

_______________________________________________________________________________

time when accumulation starts: 03:00
time when storage starts: 03:12
time when storage ends: 03:42
I_cooler during storage time: -1 mA

I_cooler =  175 mA


I_SIS: 1.8e9      
ESR particles after stacking: 2.4e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.5e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 :  3 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-02_19-10-21
\IQ_2020-04-02_19-10-14
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: FD4F77A6-57C8-40EE-A5D6-B8E84D87C0EF.jpeg  2.717 MB  Uploaded Fri Apr 3 04:44:51 2020  | Hide | Hide all
FD4F77A6-57C8-40EE-A5D6-B8E84D87C0EF.jpeg
Attachment 2: D9AB6DAC-8CB1-4AA6-8D65-EF0BEB1BC913.jpeg  2.660 MB  Uploaded Fri Apr 3 04:51:00 2020  | Hide | Hide all
D9AB6DAC-8CB1-4AA6-8D65-EF0BEB1BC913.jpeg
Attachment 3: 7ECADF49-BD0A-4AB0-82E3-8825C08C81E3.jpeg  2.381 MB  Uploaded Fri Apr 3 04:57:13 2020  | Hide | Hide all
7ECADF49-BD0A-4AB0-82E3-8825C08C81E3.jpeg
ELOG V3.1.5-fc6679b