HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 129     Entry time: Fri Apr 3 03:59:14 2020
Author: Ragan, Pierre-Michel, Dima 
Category: Runs 
Subject: Two hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 2 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 04:13,  run0300.lmd 
file running: 0300.lmd

_______________________________________________________________________________

time when accumulation starts: 04:21
time when storage starts: 04:32
time when storage ends: 06:32
I_cooler during storage time: -1 mA

I_cooler =  179 mA


I_SIS: 1.75e9      
ESR particles after stacking: 2.1e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.66e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 7 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-03_04-17-44
\IQ_2020-04-03_04-17-51
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2B409195-AF78-46AA-9B5B-F0990B564238.jpeg  2.931 MB  Uploaded Fri Apr 3 07:41:39 2020  | Show | Show all
Attachment 2: ED3309B6-82E5-4484-A787-ADF94FD55814.jpeg  3.053 MB  Uploaded Fri Apr 3 07:50:32 2020  | Show | Show all
ELOG V3.1.5-fc6679b