HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 131     Entry time: Fri Apr 3 06:35:37 2020
Author: Ragan, Pierre-Michel, Dima, Mei, Shahab 
Category: Runs 
Subject: Half hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 04:13,  run0300.lmd 
file running: 0301.lmd

_______________________________________________________________________________

time when accumulation starts: 06:50
time when storage starts: 07:01
time when storage ends: 11:01
I_cooler during storage time: -1 mA

I_cooler =  179 mA


I_SIS: 1.75e9      
ESR particles after stacking: 2.1e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.66e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 8 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-02_04-17-44
\IQ_2020-04-02_19-04-17-51
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: A04655E8-EF30-4ECB-A6F4-2B98982502FA.jpeg  2.472 MB  Uploaded Fri Apr 3 12:26:46 2020  | Hide | Hide all
A04655E8-EF30-4ECB-A6F4-2B98982502FA.jpeg
Attachment 2: AE7CF1AD-0E03-45AA-8234-D36D34E85252.jpeg  2.494 MB  Uploaded Fri Apr 3 12:27:18 2020  | Hide | Hide all
AE7CF1AD-0E03-45AA-8234-D36D34E85252.jpeg
Attachment 3: 95BAD6CD-5C2E-4B93-8CE5-0F7F6E62B4FA.jpeg  3.974 MB  Uploaded Fri Apr 3 12:27:47 2020  | Hide | Hide all
95BAD6CD-5C2E-4B93-8CE5-0F7F6E62B4FA.jpeg
ELOG V3.1.5-fc6679b