HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 134     Entry time: Fri Apr 3 11:59:50 2020
Author: Ragan, Pierre-Michel, Dima 
Category: Runs 
Subject: Four hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 04:13,  run0300.lmd 
file running: 0301.lmd

_______________________________________________________________________________

time when accumulation starts: 06:50
time when storage starts: 07:01
time when storage ends: 11:01
I_cooler during storage time: -1 mA

I_cooler =  179 mA


I_SIS: 1.75e9      
ESR particles after stacking: 2.3e6 (offset 1e5)
Number of stackings: 30
Target ON density: 3.3e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-03_04-17-44
\IQ_2020-04-03_04-17-51
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 708F0673-2D65-4EFA-902F-7067FA5885B4.jpeg  2.472 MB  Uploaded Fri Apr 3 13:06:36 2020  | Hide | Hide all
708F0673-2D65-4EFA-902F-7067FA5885B4.jpeg
Attachment 2: 8D6B87F7-B622-41B6-8CBC-E6404443987F.jpeg  2.494 MB  Uploaded Fri Apr 3 13:06:58 2020  | Hide | Hide all
8D6B87F7-B622-41B6-8CBC-E6404443987F.jpeg
Attachment 3: 2D175AD1-813B-4C6B-93E0-43B90EFE2584.jpeg  3.974 MB  Uploaded Fri Apr 3 13:12:43 2020  | Hide | Hide all
2D175AD1-813B-4C6B-93E0-43B90EFE2584.jpeg
ELOG V3.1.5-fc6679b