HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 136     Entry time: Fri Apr 3 13:21:16 2020
Author: Ragan, Mei, Shahab 
Category: Runs 
Subject: Zero hour measurement (S2: 0/35 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
S2: 0/35 mm

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 11:17,  run0303.lmd 
file running: 0304.lmd

_______________________________________________________________________________

time when accumulation starts: 12:58
time when storage starts: 13:16
time when storage ends: 13:16
I_cooler during storage time: -1 mA

I_cooler =  176 mA


I_SIS: 2e9      
ESR particles after stacking: 2.4e6 (offset 5e5)
Number of stackings: 38   (was set for 60 but we missed a few)
Target ON density: 3.54e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 2 mins
(i.e. time for which electron cooler is on after gas jet) 


NTCAp file:
SC_2020-04-03_11-20-14
\IQ_2020-04-03_11-20-05
IQ rate: 8 MS/s
(saved in drive : p)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 8560F317-7B65-476E-84EF-CFFB9C021878.jpeg  2.960 MB  Uploaded Fri Apr 3 14:26:39 2020  | Show | Show all
ELOG V3.1.5-fc6679b