HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 141     Entry time: Sat Apr 4 00:11:23 2020
Author: Ragan, Pierre-Michel, Dima 
Category: Runs 
Subject: Half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 22:11,  run0308.lmd 
file running: 0310.lmd

_______________________________________________________________________________

time when accumulation starts: 23:53
time when storage starts: 00:23
time when storage ends: 00:53
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.5e9      
ESR particles after stacking: 2.1e6 (offset 5e5)
Number of stackings: 60  
Target ON density: 4.03e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 



NTCAp file:
SC_2020-04-03_22-12-50
\IQ_2020-04-03_22-13-48
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 55E962C4-6891-44E5-937B-5D11AC0FEFCD.jpeg  2.520 MB  Uploaded Sat Apr 4 02:08:17 2020  | Hide | Hide all
55E962C4-6891-44E5-937B-5D11AC0FEFCD.jpeg
Attachment 2: 9F371840-1E58-45D2-9EF9-273D72C28626.jpeg  2.122 MB  Uploaded Sat Apr 4 02:08:37 2020  | Hide | Hide all
9F371840-1E58-45D2-9EF9-273D72C28626.jpeg
ELOG V3.1.5-fc6679b