HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 145     Entry time: Sat Apr 4 10:32:16 2020
Author: Ragan, Shahab 
Category: Runs 
Subject: Five hour measurement (S2: 0/35 mm and S6: -20/7 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 22:11,  run0308.lmd 
file running: 0313.lmd

_______________________________________________________________________________

time when accumulation starts: 09:47
time when storage starts: 10:19
time when storage ends: 15:19
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.75e9      
ESR particles after stacking: 2e6 (offset 5e5)
Number of stackings: ~70 (was set to 80 but we missed few shots)  
Target ON density: 3.91e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


I_ESR (10:30) :  1.95e6
I_ESR (11:00) :  -
I_ESR (11:37) :  1.7e6
I_ESR (12:00) :  -
I_ESR (12:30) :  -
I_ESR (13:00) :  -
I_ESR (13:37) :  1.37e6
I_ESR (14:07) :  1.28e6
I_ESR (14:30) :  -
I_ESR (15:00) :  1.20e6



NTCAp file:
SC_2020-04-03_22-12-50
\IQ_2020-04-03_22-13-48
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2020-04-04_10-46-44-779.png  257 kB  Uploaded Sat Apr 4 11:48:29 2020  | Hide | Hide all
2020-04-04_10-46-44-779.png
Attachment 2: 245A948B-69B3-47C0-9F15-0EB6E27FACF0.jpeg  2.645 MB  Uploaded Sat Apr 4 16:29:17 2020  | Hide | Hide all
245A948B-69B3-47C0-9F15-0EB6E27FACF0.jpeg
Attachment 3: C49C19FE-7274-46AB-87BA-6C10292DC620.jpeg  2.807 MB  Uploaded Sat Apr 4 16:37:15 2020  | Hide | Hide all
C49C19FE-7274-46AB-87BA-6C10292DC620.jpeg
ELOG V3.1.5-fc6679b