HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 147     Entry time: Sat Apr 4 15:59:16 2020
Author: Ragan, Shahab, Alex, Esther 
Category: Runs 
Subject: 0.5 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 22:11,  run0308.lmd 
file running: 0324.lmd

_______________________________________________________________________________

time when accumulation starts: 15:35
time when storage starts: 16:05
time when storage ends: 16:35
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.25e9      
ESR particles after stacking: 1.8e6 (offset 3.6e5)
Number of stackings: ~80  
Target ON density: 4.08e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet)  



NTCAp file:
SC_2020-04-03_22-12-50
\IQ_2020-04-03_22-13-48
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2020-04-04_16-04-30-807.png  276 kB  Uploaded Sat Apr 4 17:11:06 2020  | Hide | Hide all
2020-04-04_16-04-30-807.png
Attachment 2: 636A1F49-737F-4147-8CF0-CA7F4108B719.jpeg  2.897 MB  Uploaded Sat Apr 4 17:46:36 2020  | Hide | Hide all
636A1F49-737F-4147-8CF0-CA7F4108B719.jpeg
Attachment 3: 2020-04-04_16-49-50-990.png  129 kB  Uploaded Sat Apr 4 17:50:45 2020  | Hide | Hide all
2020-04-04_16-49-50-990.png
Attachment 4: 7B45A7EA-0421-497B-8A37-674B6792D7E9.jpeg  2.479 MB  Uploaded Sat Apr 4 18:02:22 2020  | Hide | Hide all
7B45A7EA-0421-497B-8A37-674B6792D7E9.jpeg
ELOG V3.1.5-fc6679b