HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 151     Entry time: Sat Apr 4 19:55:37 2020
Author: Ragan, Alex, Esther 
Category: Runs 
Subject: Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 
FAILED - measurement was stopped by sudden loss of the beam 

beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 19:02,  run0343.lmd 
file running: 0347.lmd

_______________________________________________________________________________

time when accumulation starts: 19:17
time when storage starts: 19:55
time when storage ends: 05:55
I_cooler during storage time: -1 mA

I_cooler =  177 mA


I_SIS: 1.8e9      
ESR particles after stacking: 2.5e6 (offset 3e5)
Number of stackings: 100  
Target ON density: xxe12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 5 mins
(i.e. time for which electron cooler is on after gas jet) 


I_ESR (20:30) :  2.25e6
I_ESR (21:00) :  2.1e6
I_ESR (21:30) :  2.0e6
I_ESR (22:00) :  1.8e6

NTCAp file:
SC_2020-04-04_19-04-52
\IQ_2020-04-04_19-04-52
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement
Attachment 1: 2020-04-04_19-54-47-760.png  335 kB  Uploaded Sat Apr 4 21:03:30 2020  | Hide | Hide all
2020-04-04_19-54-47-760.png
Attachment 2: 2020-04-04_20-02-26-363.png  305 kB  Uploaded Sat Apr 4 21:03:39 2020  | Hide | Hide all
2020-04-04_20-02-26-363.png
ELOG V3.1.5-fc6679b