HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 164     Entry time: Mon Apr 6 05:43:50 2020
Author: Ragan, Laszlo, Nikos 
Category: Runs 
Subject: One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
S2: 0/35 mm
s6: -20/7

purpose: data with TARGET ON

Detector position (CsISiPHOS):  out of the ring
Detector position (MWPC):  -60 mm

run start at 20:21,  run0540.lmd 
file running: 0558.lmd

_______________________________________________________________________________

time when accumulation starts: 05:41
time when storage starts: 06:19
time when storage ends: 07:49
I_cooler during storage time: -1 mA (20 mA)

I_cooler = 179 mA  


I_SIS: 1.75e9      
ESR particles after stacking: 2.3e6 (offset 5e5)
Number of stackings:  100 
Target ON density: 4.36e12 
Target on time for measurement: 10 mins (by event mode)      
time spend at manipulation 13 : 3 mins
(i.e. time for which electron cooler is on after gas jet) 



NTCAp file:
SC_2020-04-06_00-59-46
\IQ_2020-04-06_00-59-38
IQ rate: 8 MS/s
(saved in drive : O)

copy and repeat the above (below the line) for every storage time measurement/
Attachment 1: 2020-04-06_06-18-59-809.png  326 kB  Uploaded Mon Apr 6 07:20:02 2020  | Show | Hide all | Show all
Attachment 2: 946073FA-3077-4CBF-900B-565BD19CF040.jpeg  2.706 MB  Uploaded Mon Apr 6 08:58:21 2020  | Hide | Hide all | Show all
946073FA-3077-4CBF-900B-565BD19CF040.jpeg
Attachment 3: 10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg  2.612 MB  Uploaded Mon Apr 6 09:03:17 2020  | Show | Hide all | Show all
Attachment 4: 2020-04-06_08-03-40-493.png  127 kB  Uploaded Mon Apr 6 09:06:27 2020  | Hide | Hide all | Show all
2020-04-06_08-03-40-493.png
ELOG V3.1.5-fc6679b