HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 29     Entry time: Sat Mar 28 11:00:14 2020
Author: Ragan, RuiJiu, Mei, Yuri, Tino 
Category: Detectors 
Subject: Movement of detector 
10:51 am the CsISiPHOS is moved to 65 mm from 60 mm.The spot on the DSSSD is changed by 5 mm which confirms the hit of the beam.

11:05 
Detector is moved back to 60 mm.
Attachment 1: IMG_20200328_110253.jpg  6.593 MB  | Hide | Hide all | Show all
IMG_20200328_110253.jpg
Attachment 2: IMG_20200328_110258.jpg  6.080 MB  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b