HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 35     Entry time: Sat Mar 28 13:19:56 2020
Author: Ragan 
Category: Runs 
Subject: Template 
beam: 
energy: 
storage time:

purpose: data with TARGET ON

Detector position (CsISiPHOS):  mm
Detector position (MWPC):       mm

run start at xx:xx , first file: run0xxx.lmd
run stop  at xx:xx , last file:  run0xxx.lmd

_______________________________________________________________________________

time: 

I_cooler =  mA



HV1
CH1 voltage:           60V  
CH1 leakage current:   uA

CH2 voltage:           60V  
CH2 leakage current:   uA

CH3 voltage:           60V  
CH3 leakage current:   uA

CH4 voltage:           60V  
CH4 leakage current:   uA

HV2
CH1 voltage:           60V  
CH1 leakage current:   uA

CH2 voltage:           60V  
CH2 leakage current:   uA

CH3 voltage:           -50V  
CH3 leakage current:   uA

CH4 voltage:           -160V  
CH4 leakage current:   uA


SIS particles before:           
ESR particles after stacking:     
Number of stackings:
Target ON density:   
Target on time for measurement:           


NTCAp file:
IQ_2020-03-27_21-02-31/0000xxx.iq.tdms
SC_2020-03-27_21-02-31/0000xxx.iq.tdms

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b