HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 59     Entry time: Sun Mar 29 21:34:46 2020
Author: Ragan 
Category: Runs 
Subject: First run 
beam: 206Pb81+
energy: 400 MeV/u

purpose: data with primary beam for detector efficiency and cross-section calculations

Detector position (CsISiPHOS): 60 mm
Detector position (MWPC):     -10 mm

run start at 21:25 , run file: run0250.lmd
run stop  at 21:31 , close file:  run0250.lmd

_______________________________________________________________________________

time: 21:25

I_cooler = 177 mA

SIS particles before:  2E8        
ESR particles when gas jet is on:  3.6E6
Target ON density:  4.34E12        


NTCAp file:
SC_2020-03-29_21-27-57
IQ_2020-03-29_21-27-57

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b