HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 64     Entry time: Mon Mar 30 01:01:53 2020
Author: Ragan 
Category: Runs 
Subject: First measurement with 206Pb81+ beam 
beam: 206Pb81+
energy: 400 MeV/u

purpose: data with primary beam for detector efficiency and cross-section calculations

Detector position (CsISiPHOS): 60 mm
Detector position (MWPC):     -10 mm

run start at 00:28 , run file: run0252.lmd
file currently running: run0257.lmd

_______________________________________________________________________________

time: 01:00

I_cooler = 176 mA

SIS particles before:  3.3E8        
ESR particles when gas jet is on:  2.4E6
Target ON density:  4.49E12        
Target on time : 5 minutes

NTCAp file:
SC_2020-03-30_00_28_45 (run ongoing)
IQ_2020-03-30_00_28_45 (run ongoing)
(saved in drive: p)

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b