HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 67     Entry time: Mon Mar 30 01:43:58 2020
Author: Ragan 
Category: General 
Subject: First measurement with 206Pb81+ beam pattern details 
The following shows the pattern for first measurement in ESR (gas jet is on for = 60*5 secs = 300 secs as it can be seen on step SC7 in pattern).
One injection cycle runs for ~ 6 mins.
Attachment 1: 90FC7D41-6C97-4760-B5A3-3CF60643A405.jpeg  3.315 MB  | Hide | Hide all | Show all
90FC7D41-6C97-4760-B5A3-3CF60643A405.jpeg
Attachment 2: BF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg  4.045 MB  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b