HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 68     Entry time: Mon Mar 30 02:00:46 2020
Author: Ragan 
Category: Runs 
Subject: First measurement with 206Pb81+ beam 
beam: 206Pb81+
energy: 400 MeV/u

purpose: data with primary beam for detector efficiency and cross-section calculations

Detector position (CsISiPHOS): 60 mm
Detector position (MWPC):     -10 mm

run start at 01:19 , run file: run0258.lmd
run stop at 02:05: stop file: 0265.lmd

_______________________________________________________________________________

time: 02:05

I_cooler = 176 mA

SIS particles before:  3.3E8        
ESR particles when gas jet is on:  4E6
Target ON density:  4.53E12        
Target on time : 5 minutes

NTCAp file:
SC_2020-03-30_01-18-31
IQ_2020-03-30_00_22-52
(saved in drive: p)

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b