HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Bound beta decay experiment on Tl-205  Not logged in ELOG logo
Message ID: 99     Entry time: Mon Mar 30 14:48:02 2020
Author: ruijiu and Tino 
Category: Detectors 
Subject: The leakcurrent of SiPad is over the setting limit. 
Because the 
leakcurrent of 
6 Sipads is 
over the 
setting limit, 
the alarm of 
HV module is 
sounding.
Ruijiu 
increase the 
limit to 1500 
uA.
Attachment 1: Screenshot_20200330-145551.jpg  1.281 MB  Uploaded Mon Mar 30 15:56:25 2020  | Hide | Hide all | Show all
Screenshot_20200330-145551.jpg
Attachment 2: Screenshot_20200330-145544.jpg  1.238 MB  Uploaded Mon Mar 30 15:56:50 2020  | Show | Hide all | Show all
Attachment 3: IMG_20200330_144915.jpg  2.601 MB  Uploaded Mon Mar 30 16:02:31 2020  | Show | Hide all | Show all
ELOG V3.1.5-fc6679b