HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  dN=0 experiment  Not logged in ELOG logo
Message ID: 12     Entry time: Fri Mar 26 08:35:25 2021
Author: Martino Trassinelli 
Category: Runs 
Subject: End of the Be-like beam 
Problems from the high frequency in unilac. We stoped the acquisition at 6:50 corresponding to the lmd file n. 1184.
Once the beam back in the SIS, we have a bad injection in the ESR and nobody to adjust it. Because of the plan to go to new settings in the ESR, We stop this beam period and we warm the target to be ready for the week end.
ELOG V3.1.5-fc6679b