HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  dN=0 experiment  Not logged in ELOG logo
Message ID: 5     Entry time: Thu Mar 25 01:37:04 2021
Author: Martino Trassinelli 
Category: Runs 
Subject: Change in the gas-jet density 
We reduced the pressure of the gas-jet target at 0:45AM. Now it is about 7E11 (indicated as 7x10E11 in the webpage of the control).
Beam cycle: ~45 s
Target on: 2x5  = 10 s

For the cameras: 
Integration time: 10 s
waiting time: 30 s
Attachment 1: DSC_3187.JPG  3.568 MB  | Hide | Hide all
DSC_3187.JPG
ELOG V3.1.5-fc6679b