HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  dN=0 experiment  Not logged in ELOG logo
Message ID: 6     Entry time: Thu Mar 25 08:59:50 2021
Author: Martino Trassinelli 
Category: Runs 
Subject: Summary of the last evening night 
Starting from about 23:40 we have a complete set-up with Ge detector and particle detector. Gas jet density about 1.1e12.

Between 23:40a and 00:10 the waiting time of the CCDs was too short --> additional noise in the CCDs.
Then failure of the GE camera too in data07 files.

Starting from 00:45, 
- new gas jet pressure of 7E11 a/cm2
- injection with 1E7 ions
- cycle time: 46 seconds
- measurement time: 10 secons 
- CCD waiting time: 30 seconds

No problem until 5:04 --> failure in the UNILAC

6:30 Zn calibration (01, 20 minutes) but with the ESR cycle still active!! 
6:50 backround calibration (background1)

7:15 Ge detector filling

7:25 Restart new measurement data05

8:45: Closing data05 opening data06

8:50: injection failure in ESR for files n=3-4

8:52 beam is back

(then we try to write here more regularly.....)
ELOG V3.1.5-fc6679b