Mon Apr 5 16:07:36 2021, Robert, Runs, He-like run
|
run started thursday 21/04/01 20:00,
ended monday 21/04/05 15:20,
time span of 91.5 h,
|
Tue Apr 6 14:27:59 2021, Martino, Runs, electron cooler voltages
|
Parameter U90+ @ 30.160 MeV/u U91+ @ 41.035 MeV/u U89+ @ 39.293 MeV/u
gamme 1.0324 1.04407 1.0422
Ue 16556 V 22520 V 21564 V
|
Tue Apr 6 14:47:26 2021, Robert, Analysis, stability of the spectrometers during He and Be run
|
the large spike in the outer spectrometer is attributed to an open door of experimentierhalle, which we closed at ~17:00 at 21/04/05.
It might be necessary to exclude some of the data between 210405 17:00 and 22:00 since we had a shift of one pixel between these two calibrations |
Tue Apr 6 14:59:19 2021, Robert, Runs, second Be-like run
|
run started 210405 17:50
run ended 210407 11:30
no of files: 1452
|
Wed Apr 7 11:51:54 2021, Robert, Runs, stability of ion beam current during Be-like run
|
|
Wed Apr 7 11:52:52 2021, Robert, Analysis, spectrum He-like
|
|
Wed Apr 7 11:53:33 2021, Robert, Analysis, spectrum Li-like
|
|
Wed Apr 7 11:59:01 2021, Robert, Analysis, spectrum Be-like
|
|
|