ID |
Date |
Author |
Category |
Subject |
Text |
 |
21
|
Mon Apr 5 16:07:36 2021 |
Robert | Runs | He-like run | run started thursday 21/04/01 20:00,
ended monday 21/04/05 15:20,
time span of 91.5 h,
|
|
22
|
Tue Apr 6 14:27:59 2021 |
Martino | Runs | electron cooler voltages | Parameter U90+ @ 30.160 MeV/u U91+ @ 41.035
MeV/u U89+ @ 39.293 MeV/u
gamme 1.0324 1.04407 |
|
23
|
Tue Apr 6 14:47:26 2021 |
Robert | Analysis | stability of the spectrometers during He and Be run | the large spike in the outer spectrometer
is attributed to an open door of experimentierhalle,
which we closed at ~17:00 at 21/04/05.
|
|
24
|
Tue Apr 6 14:59:19 2021 |
Robert | Runs | second Be-like run | run started 210405 17:50
run ended 210407 11:30
no of files: 1452
|
|
25
|
Wed Apr 7 11:51:54 2021 |
Robert | Runs | stability of ion beam current during Be-like run | |
|
26
|
Wed Apr 7 11:52:52 2021 |
Robert | Analysis | spectrum He-like | |
|
27
|
Wed Apr 7 11:53:33 2021 |
Robert | Analysis | spectrum Li-like | |
|
28
|
Wed Apr 7 11:59:01 2021 |
Robert | Analysis | spectrum Be-like | |
|