now we try to move the capture detector (MWPC in the 1. dipol before our Si setup) inside the ring while the DAQ was ON
we tried to move it as close as possible to the beam
On the picture below you can see that we had some increased current while moving the MWPC --> scattering from the beam while scraping it |