HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 127     Entry time: Sat Mar 21 13:24:10 2020
Author: Laszlo 
Category: Runs 
Subject: run entry - run063 
Year:  
open file : run063

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON, we had to stop becasue Ulli was noticing some strange effects with the target density. He needs now time to optimize that.

Detector position (Si): -24 mm

run start at 15:04 , first file: run063_0001.lmd
run stop  at 15:04:21 , last file:  run063_0xxx.lmd

_______________________________________________________________________________

time: 15:04 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   25 Hz
Xray_145:  30 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.10 uA


SIS particles before:           ~2e9
ESR particles at injection:     estimated ~1e6
ESR particles after decel.:     
Target ON density:              1.52e13


copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b