HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 130     Entry time: Sat Mar 21 14:52:05 2020
Author: Laszlo 
Category: General 
Subject: target optimization 
Year:  
previous position of the beam at target was -3mm (for the night position)
max. intensity position of the beam at target 1s -1mm. --> now it is set to this position

now Ulli also increasing the density of the jet. Right now Ulli is warming the noozle. --> takes 1hour roughly.
Earlier: 1.4E13
Now: 
Attachment 1: IMG_20200321_145105.jpg  3.561 MB  | Hide | Hide all
IMG_20200321_145105.jpg
Attachment 2: IMG_20200321_145059.jpg  4.849 MB  | Hide | Hide all
IMG_20200321_145059.jpg
ELOG V3.1.5-fc6679b