HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 163     Entry time: Sun Mar 22 03:24:39 2020
Author: Dima, Pierre 
Category: Runs 
Subject: run entry - run072 
Year:  
open file : run072

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 02:54 , first file: run072_0001.lmd
run stop  at : , last file:  run071_0xxx.lmd

_______________________________________________________________________________

time: 03:24 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   48 Hz
Xray_145:  25 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~1.8e9
ESR current at injection:       21 uA
ESR particles after decel.:     
Target ON density:              3.6e13


copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b