Uli is still working with gas jet target however the vacuum problem with the SIS is resolved now.
open file : run082
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 12:25 , first file: run082_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 12:25 pm.
ON Rates
Si_X: Hz
Si_Y: Hz
Xray_35: Hz
Xray_90: Hz
Xray_145: Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.06 uA
SIS particles before: ~3.3e9
ESR current at injection: uA
ESR particles after decel.:
Target ON density: Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |