Message ID: 184     Entry time: Sun Mar 22 12:26:15 2020
Author: Esther, Ragan 
Category: Runs 
Subject: run entry - run082, Uli working with gas jet target 
Year:  
Uli is still working with gas jet target however the vacuum problem with the SIS is resolved now. 
open file : run082

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 12:25 , first file: run082_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 12:25 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.3e9
ESR current at injection:        uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes