HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 189     Entry time: Sun Mar 22 14:23:50 2020
Author: Esther, Ragan, Michael, Laszlo 
Category: Runs 
Subject: run entry - run084, Uli working with gas jet target 
Year:  
Uli is still working with gas jet target. 
open file : run084

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 14:25 , first file: run084_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 14:25 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.07 uA


SIS particles before:           ~2.5e9
ESR current at injection:        11 uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b